Laserfiche WebLink
<br />I <br /> <br />David J. Love, P.E <br />Page 6 <br /> <br />I <br /> <br />I <br /> <br />improvements for ~l wetland that had been destroyed and also involved the relocation and restoration of a stream in <br />Edwards, CO. Work included meetings with the US Anny Corps of Engineers representatives on-site, field design of <br />stream improvements including stream meanders, point bars, riparian terraces, and Best Management Practices, worked <br />closely with wetlands biologist in the placement of vegetative plantings and layout of the riparian vegetation. <br /> <br />I <br /> <br />Kennedy Golf COllrse Expansion, City and County of Denver, Parks and Recreation. Project Manager, Assisted in <br />the preparation of 111C mitigation plan as well as designed in-stream riparian improvements using Best Management <br />Practices. Respon~,ble for the monitoring of the mitigation plan for the project. Assisted in the preparation and review <br />of the US Army C. ,rps of Engineers 404 permit for the project Also, supervised the preparation of the hydraulic <br />analysis of Cherry ('reek for the installation of two new pedestrian footbridges, a low water golf cart crossing, and a <br />golf cart and pedest:'ian trail systems. <br /> <br />I <br /> <br />I <br /> <br />Waterglen Planned Unit Development in Fort Collins, W. W, Reynolds Company. Supervised and coordinated with <br />the US AmlY Corp, of Engineers Ficld Office representative in the detennination of the wetlands on this 160-acre <br />mixed use development (residential, multi-family and commercial). Responsible for the detennination of wetland <br />boundaries and prc],aration of a 404 Permit Assisted in the development of a mitigation plan for areas of disturbance <br />due to installation" I. water and sanitary sewer facilities and a large culvert for carrying the 1 OO-year flows from Cooper <br />Slough. <br /> <br />I <br /> <br />I <br /> <br />Non-Point Source Pollution Improvements using Best Management Practices in the City of Boulder, Boulder <br />Creek, Project Md:lagcr. Engineered the design of in-stream, riparian and wetland mitigation and flood control <br />improvements through four reaches of Boulder Creek with the purpose of creating wetlands and riparian areas to <br />improve stream "';llc[ quality. Designed thalweg channels, v-dams, s-dams, willow cutting planting sites, waddling <br />sites, etc. to rcstor~ the stream to a morc natural environment whereby cooling the water and lower the number of <br />pollutants in the \\,:1\('[ by use of vegetation and Best Management Practices. <br /> <br />I <br /> <br />I <br /> <br />SITE ANAL YSIS .IND FINAL DESIGN <br /> <br />I <br /> <br />University of Colorado at Boulder Research Park, Master plan, flood mitigation plan, site drainage plan, design <br />guidelines, and fined design of 160 acre site including development of a wetland park in a twenty-three acre floodplain, <br />water, storm sewer and sanitary sewer; street design including a six lane parkway and an additional two lane street; <br />wetlands, 100-year Ilood channel for Skunk Creek, construction management, project management, etc. - University of <br />Colorado at Bookkr. Principal-in-Chargc. <br /> <br />I <br /> <br />I <br /> <br />Western State College - Gunnison, Colorado, Civil engineering including preparation of a Water System Master <br />Plan for the entire College campus; preparation of final design and construction documents for construction of the first <br />two phases of the] >loject to be constructed in the summer of 1996; final design of the balance of the campus water <br />system during the LLiI and winter of 1996 with construction in the summer of 1997. <br /> <br />I <br /> <br />University of Colorado at Boulder, Folsom Street Entry, Site analysis, landscape architecture design for entry <br />feature to new licld house at the stadium. Principal-in-Charge, <br /> <br />I <br /> <br />University of Coll)l'ado at Boulder Ero Biology Greenhouse, Site analysis, layout, landscape architecture and final <br />design for new grcl'ilhouse. Principal-in-Charge. <br /> <br />I <br /> <br />City of Boulder - 13th Street & Municipal Campus Plaza Improvements Project, City of Boulder including design <br />of 13th Street imprll\'Cillcnts including demolition of existing road, curb, gutter and sidewalks and design of new street <br />plaza and off street municipal campus plaza. Also, included were floodplain improvements design and permitting for <br />the City ofBoulder\ new Municipal Plaza. <br /> <br />I <br /> <br />Waterglen Planll(-d Unit Development, Fort Collins, CO, Civil engineering including water, stonn sewer and <br />sanitary sewer final ,!esign, drainage and flood control engineering and roadway design for a 160-acre low to moderate <br />income housing de\dopment. Owner: W.W. Reynolds Company, Principal-in-Charge. <br /> <br />I <br /> <br />I <br /> <br />Love & Associates, Inc. <br />