<br />through Martin I'ark, Design Engineer for the design of 100-year channel improvements through a public park,
<br />Martin Park in southwest Boulder and an elementary school campus, Martin Elementary School. The challenge was to
<br />design 100-year flond channel improvements while improving stormwater quality from multiple storm sewers which
<br />discharged directly into Bear Canyon Creek. Our design was to design a stormwater quality pond to which the 24-inch
<br />storm sewer discharged. The stormwatcr quality pond included a forebay where the initial discharge of debris and
<br />sediment would occur prior to filling the remaining portion of the basin. This forebay would be cleaned on an as-
<br />needed basis. The pond would then discharge at historic rates back into Bear Canyon Creek The channel
<br />improvements included construction of three new boulder drop structures, the repair of two existing drop structures and
<br />the constmction of;1 boulder lined low flow channel.
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />University of Colorado - Boulder - Research Park, Prime consultant for the design of all core infrastructure for the
<br />160-acre CU Research Park including water, storm sewer and sanitary sewer utility, coordination with Public Service
<br />Company for design of gas and electric utilities, the University Telecommunication Department for
<br />telecommunication" services; street design including a six lane parkway through the park including entry features,
<br />presentation to the Design Review Board of project including graphic renderings of the project; design of a 100-year
<br />flood channel for SI,ounk Creek through the Research Park; design of a 23-acre open space/wetland/water quality
<br />system of ponds, pmject management and full time construction management which is on-going. Principal Engineer
<br />
<br />I
<br />
<br />I
<br />
<br />Water System Master Plan and Construction Drawings - Western State College - Gunnison, Colorado, civil
<br />engineering including preparation of a \Vater System Master Plan for the entire College campus; preparation of final
<br />design and construction documents for construction of the first two phases of the project to be constructed in the
<br />summer of 1996; Ill1al design of the balance of the campus water system during the fan and winter of 1996 with
<br />construction in the ~llmmer of 1997. Principal Engineer.
<br />
<br />I
<br />
<br />I
<br />
<br />City and County of Denver - Kennedy Golf Course Expansion Project, Site Planning and final design of all water,
<br />sanitary sewer, roads, parking lots, ctc. for the new Maintenance Building at the newly expanded 9 hole addition to the
<br />Kennedy Golf Course. Also provided trail design, wetland delineation, 404 permit and wetland mitigation design for
<br />this project.
<br />
<br />I
<br />
<br />I
<br />
<br />Waterglen PUD ill Fort Collins, Design of all water, sanitary and storm sewer infrastructure for a new 160 acre low
<br />to moderate income housing development. Also, included drainage and flood control improvements for the site as well
<br />as \vetland delinealill!1, mitigation and permit preparation.
<br />
<br />I
<br />
<br />Battlement .Mesa Development, Design of all core water and sewer infrastructure for new community population of
<br />20,000, EXXON, Il1e.. Project Manager.
<br />
<br />University of Colorado at Boulder Research Park, Phase I Infrastructure, University of Colorado at Boulder.
<br />Project Manager.
<br />
<br />I
<br />
<br />75th Street Bridgl' Design, Bridge design, road relocation, traffic control and channel improvements, UD&FCD and
<br />Boulder County, C,lorado. Project Manager/Engineer.
<br />
<br />I
<br />
<br />ENVIRONMENT,If- DESIGN AND WETLAND MITIGATION
<br />
<br />I
<br />
<br />University of Colorado at Boulder Research Park - Wetland Creation/Replacement Project, Principal Engineer.
<br />Supervised and dcsl,o;ned an II-acre wetland creation/replacement project at the CU Research Park. The Research Park
<br />is a 160-acre parcel which has been designed to create 10 large commercial office building development sites. The
<br />Rcscarch Park cOlll"incd a 9-acre wetland which was destroyed and created/restored on the north end of the park site.
<br />This wetland also "wed as a stormwater quality treatment basin as well as flood storage for Boulder Creek. The
<br />newly created ll-al'rc wetland \vas based upon the construction of 4 large ponds, 40 different types of vegetation were
<br />planted along the k,nks of the lakes and \vithin the lakes under water. This wetland was recognized as being a model
<br />wetland/flood contl, ,I design for thc nation by the US Army Corps of Engineers,
<br />
<br />I
<br />
<br />I
<br />
<br />Edwards, CO \\'t.'lland Restoration Project, Designed in-stream improvements along with bank wetland restoration
<br />
<br />I
<br />
<br />Love & Associates, Inc.