Laserfiche WebLink
<br />I <br />II <br /> <br />David J. Love. PE <br />Page 7 <br /> <br />Storage Tek, Site planning and final design for two-fold expansion of Longmont facility. Principal-in-Charge. <br /> <br />I <br /> <br />I <br /> <br />Kennedy Golf Course Expansion, City and County of Denver including site grading and drainage design for a 9-ho]e <br />expansion to the C\i,ting Kennedy Golf Course. Also included civil engineering for maintenance facility and road and <br />parking lot impro\'L'l11ents. <br /> <br />I <br /> <br />City of Boulder Police Building, City of Boulder, Site analysis, parking lot and site drainage design to provide <br />aesthetic yet secure )itc. Principal-in-Charge. <br /> <br />Cronholm MasOIJrY, Site analysis and master planning for multi-tenant industrial site in Commerce City, Colorado. <br />Principal-in-Charg" . <br /> <br />I <br /> <br />Bou]der High Sehonl Expansion, Site analysis and final design of campus enlargement plan which decreased flood <br />elevations in do\\ :110WO Boulder. This was a joint City of Boulder and Boulder Valley School District project. <br />Principal-in-Charge. <br /> <br />I <br /> <br />SPECIAL STUD] [!i <br /> <br />I <br /> <br />FEMA Region VIII Flood Studies, 1990-1994, Federal Emergency Management Agency (FEMA). Principa]-in- <br />Charge. <br /> <br />I <br /> <br />High Hazard Flood Zone Analysis, Scientific and flume analysis of flood forces associated with human stability in <br />floodplains, City 01 Iloulder, Colorado. Principal-in-Charge. <br /> <br />I <br /> <br />Drainage ImproHment Assessment District, Analysis to determine equitable apportionment of improvement costs to <br />landowners, TO\vn of Columbine Valley, Colorado. Principal-in-Charge. <br /> <br />I <br /> <br />Hydraulic Analy';.' of Boat Chute and Distensible Dam, First whitewater kayak chute in the Denver metro area, <br />Platte River Dcycl(ll'l11ent Committee, Colorado. Project Engineer. <br /> <br />I <br /> <br />Wittcmyer Pond~ Analysisl Conversion of a gravel mine site into a water storage reservoir, City of Boulder, <br />Colorado. Princip:ll-in-Charge. <br /> <br />I <br /> <br />Analysis of Boulder Creek in the Vicinity of 75th Street Wastewater Treatment Plant, Report for redesign oflbe <br />City's wastewater trc'atment plant, City of Boulder, Colorado. Principal-in-Charge. <br /> <br />Lena Gnlch Letter of Map Revision, City of Wheat Ridge, Colorado. Project Manager. <br /> <br />I <br /> <br />Drainage Plan Relicws, New Mercer Ditch Company, Colorado. Project Manager. <br /> <br />I <br /> <br />Superintendent, Enterprise Ditch Company, Colorado. <br /> <br />Roaring Fork and Frying Pan Rivers Floodplain Information Report, Colorado Water Conservation Board, <br />Colorado. Project \ l~mager. <br /> <br />I <br /> <br />Library and Munic;pal Building Floodprooling Analysis, City of Boulder, Colorado. Project Manager. <br /> <br />I <br /> <br />Safety Evaluation of Dams, Adolph Coors Company, Colorado. Project Engineer. <br /> <br />I <br /> <br />Flood Protection Iksign School, Co-Instructor for weeklong course taught to college professors, and was co-producer <br />and narrator for oll,-'-hour video on flood protection design for FEMA. Special Consultant. <br /> <br />Lawn Lake Dam Failure, Special consultant for litigation for environmental planning and construction costs for re- <br /> <br />I <br /> <br />Love & Associates, Inc. <br />