Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table IV <br />Unit Prices Used for Estimated <br />Construction Costs <br /> <br />Item <br /> <br />Concrete (including concrete, reinforcing <br />steel, structure backfill, concrete <br />sidewalk and gutter and pavement <br />removal and replacement) <br /> <br />Gabions and Mattress (includes filter <br />material) <br /> <br />Riprap <br /> <br />Seeding (Dry land grasses) <br /> <br />Excavation <br /> <br />Fill <br /> <br />108-inch RCP <br /> <br />66-inch RCP <br /> <br />36-inch RCP <br /> <br />Concrete Collars <br /> <br />Relocate 6" Water Line <br /> <br />Relocate 10" Water Line <br /> <br />Reservoir Embankment (includes stripping, <br />cutoff trench excavation, fill, <br />u/s slope protection, embankment <br />drain and toe drain materials. <br />Price based on assumption that fill <br />available within one-half mile of <br />site and can be moved by scraper) <br /> <br />-23- <br /> <br />Unit Cost <br /> <br />A cost contingency of 15% of the estimated construction cost is <br />included to cover incidental costs. Engineering costs include <br />final engineering design, surveying, soils testing and normal <br />construction services. Fiscal, legal and administrative costs <br />are included to cover costs of financing, appraisal, land acquisi~ <br />tion and other miscelhneous project implementation costs. <br />Operations and maintenance costs are included and are based on the <br />following percentages of construction costs, for annual maintenance <br />costs (Ref. 3). <br /> <br />$ 190/CY <br /> 80/CY <br /> 25/CY <br /> 1000/AC <br /> 2.50/CY <br /> 2.00/CY <br /> 1l0/LF <br /> 90/LF <br /> 45/LF <br /> 300/EA. <br /> 2000/EA. <br /> 2500/EA. <br /> 3.60 <br /> <br />Earth Channels: <br /> <br />Annual 0 & M = 3.0% Construction <br />Cost <br />Annual 0 & M = 0.5% Construction <br />Cost <br />Annual 0 & M = 0.1% Construction <br />Cost <br /> <br />Earth Dams: <br /> <br />Concrete Channels: <br /> <br />Table V <br />Cost Breakdown <br /> <br /> Arvada Jefferson County Total <br />Utilities 5,000 5,000 10,000 <br />Traffic 36,000 214,000 250,000 <br />Drainage 245,000 255,000 500,000 <br />Reservoirs 907,000 907,000 <br />Total Construction 1,193,000 474,000 1,667,000 <br /> Cost <br />+ 15% Contingency 179,000 71,000 250,000 <br /> (Construction) <br />Total 1,372,000 545,000 1,917,000 <br />+ 10% Engineering 137,000 55,000 192,000 <br />Total 1,509,000 600,000 2,109,000 <br />Right-of-Way 1,040,000 745,000 1,785,000 <br />Total 2,549,000 1,345,000 3,894,000 <br />+12% F.L.A.* 306,000 162,000 468,000 <br />Total 2,855,000 1,507,000 4,362,000 <br />+ 0 & M Costs** 108,000 6,000 114,000 <br />GRAND TOTAL 2,963,000 1,513,000 4,476,000 <br /> *Fiscal, Legal, Administrative <br /> **Present Worth of Annual Cost at 8% for 50 years <br />