<br />Table IV
<br />Unit Prices Used for Estimated
<br />Construction Costs
<br />
<br />Item
<br />
<br />Concrete (including concrete, reinforcing
<br />steel, structure backfill, concrete
<br />sidewalk and gutter and pavement
<br />removal and replacement)
<br />
<br />Gabions and Mattress (includes filter
<br />material)
<br />
<br />Riprap
<br />
<br />Seeding (Dry land grasses)
<br />
<br />Excavation
<br />
<br />Fill
<br />
<br />108-inch RCP
<br />
<br />66-inch RCP
<br />
<br />36-inch RCP
<br />
<br />Concrete Collars
<br />
<br />Relocate 6" Water Line
<br />
<br />Relocate 10" Water Line
<br />
<br />Reservoir Embankment (includes stripping,
<br />cutoff trench excavation, fill,
<br />u/s slope protection, embankment
<br />drain and toe drain materials.
<br />Price based on assumption that fill
<br />available within one-half mile of
<br />site and can be moved by scraper)
<br />
<br />-23-
<br />
<br />Unit Cost
<br />
<br />A cost contingency of 15% of the estimated construction cost is
<br />included to cover incidental costs. Engineering costs include
<br />final engineering design, surveying, soils testing and normal
<br />construction services. Fiscal, legal and administrative costs
<br />are included to cover costs of financing, appraisal, land acquisi~
<br />tion and other miscelhneous project implementation costs.
<br />Operations and maintenance costs are included and are based on the
<br />following percentages of construction costs, for annual maintenance
<br />costs (Ref. 3).
<br />
<br />$ 190/CY
<br /> 80/CY
<br /> 25/CY
<br /> 1000/AC
<br /> 2.50/CY
<br /> 2.00/CY
<br /> 1l0/LF
<br /> 90/LF
<br /> 45/LF
<br /> 300/EA.
<br /> 2000/EA.
<br /> 2500/EA.
<br /> 3.60
<br />
<br />Earth Channels:
<br />
<br />Annual 0 & M = 3.0% Construction
<br />Cost
<br />Annual 0 & M = 0.5% Construction
<br />Cost
<br />Annual 0 & M = 0.1% Construction
<br />Cost
<br />
<br />Earth Dams:
<br />
<br />Concrete Channels:
<br />
<br />Table V
<br />Cost Breakdown
<br />
<br /> Arvada Jefferson County Total
<br />Utilities 5,000 5,000 10,000
<br />Traffic 36,000 214,000 250,000
<br />Drainage 245,000 255,000 500,000
<br />Reservoirs 907,000 907,000
<br />Total Construction 1,193,000 474,000 1,667,000
<br /> Cost
<br />+ 15% Contingency 179,000 71,000 250,000
<br /> (Construction)
<br />Total 1,372,000 545,000 1,917,000
<br />+ 10% Engineering 137,000 55,000 192,000
<br />Total 1,509,000 600,000 2,109,000
<br />Right-of-Way 1,040,000 745,000 1,785,000
<br />Total 2,549,000 1,345,000 3,894,000
<br />+12% F.L.A.* 306,000 162,000 468,000
<br />Total 2,855,000 1,507,000 4,362,000
<br />+ 0 & M Costs** 108,000 6,000 114,000
<br />GRAND TOTAL 2,963,000 1,513,000 4,476,000
<br /> *Fiscal, Legal, Administrative
<br /> **Present Worth of Annual Cost at 8% for 50 years