<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table VI <br />Plan Implementation Priority <br />Van Bibber Creek and South Tributary <br /> <br />- PLAN IMPLEMENTATION - <br /> <br />Priority <br /> <br />Entity <br /> <br />The proposed drainageway improvements outlined can be implemented <br /> <br /> <br />as one project or as many projects. The need exists for all <br /> <br /> <br />the proposed improvements, however, the need for some is greater <br /> <br />than others. Table VI lists the recommended priority or order <br /> <br /> <br />of implementation of various phases of the proposed plan. <br /> <br />1. <br /> <br />Jeff CO- <br />Hyatt Lake <br /> <br />Arvada <br /> <br />2. <br /> <br />3. <br /> <br />Arvada <br /> <br />The recommended order of priority was established based on <br />(1) present average annual damage, and (2) improvement effectiveness, <br />and (3) total system effectiveness. Upon completing all 15 phases <br />of the proposed plan, the total system will be complete and fully <br />operational. <br /> <br />4. <br /> <br />Arvada <br /> <br />5. <br /> <br />Arvada <br /> <br />I <br />I <br />I <br />I <br /> <br />6 . Arvada <br />7. Jeff CO <br />8. Jeff CO <br />9. Jeff CO <br />10. Jeff CO <br />11. Jeff CO <br /> <br />The lower items of priority are not critical to the phase of <br />implementation as outlined in the recommendations. The basis <br />of establishment of the priority for these items is more need <br />than to impact on the priorities following. The first six <br />priorities should not be reprioritized as the phasing outline <br />is important to proper operation. We feel items six through <br />eight represent a logical sequence of implementation. The Croke <br />Canal is given a higher priority than McIntyre Street because of <br />the potential damages associated with flood waters being diverted <br />within the irrigation canal. Otherwise, implementation should <br />be in an upstream to downstream descending priority. <br /> <br />Jeff CO <br /> <br />I <br /> <br />12. <br /> <br />Jeff CO <br /> <br />I <br />I <br /> <br />13. <br /> <br />14. <br />15. <br /> <br />Jeff CO <br />Jeff CO <br /> <br />I <br />I <br />I <br /> <br />I <br /> <br />Improvements <br /> <br />Obtain flood storage <br />agreements <br /> <br />Obtain right-of-way <br />dam site to 58th Avenue <br /> <br />Obtain right-of-way <br />58th Street to 58th Avenue <br />(north side) <br /> <br />Reservoir Construction <br />and right-of-way <br />acquisition <br /> <br />Independence Street to <br />Ralston Creek - <br />flood proofing improvements <br /> <br />Oak Street to Independence <br />Street drainage improvements <br /> <br />Croke Canal Improvements <br /> <br />McIntyre Street and Farmer's <br />High Line Canal improvements <br /> <br />Indiana Street improvements <br /> <br />South Boulder Canal - <br />drainageway separation <br /> <br />Ulysses Street improvements <br />(Main Stream to South <br />Tributary) <br /> <br />Juchem Ditch - <br />drainageway separation <br /> <br />Church Ditch - <br />drainageway separation <br />(Main Stream to South <br />Tributary) <br /> <br />West 60th Street improvements <br /> <br />Miscellaneous flood proofing <br /> <br />TOTAL <br /> <br />-24- <br /> <br />Total <br />Estimated Costs <br /> <br />$ <br /> <br />706,000 <br /> <br />193,000 <br /> <br />2,282,000 <br /> <br />6,000 <br /> <br />482,000 <br />143,000 <br /> <br />95,000 <br />73,000 <br /> <br />165,000 <br /> <br />108,000 <br /> <br />81,000 <br /> <br />82,000 <br />57,000 <br />3,000 <br /> <br />$4,476,000 <br />