Laserfiche WebLink
<br />The initial coordination meeting for the City of Brighton was held <br />at a meeting attended by personnel of Gingery Associates, Inc., the <br />FIA, and official s of the ci ty of Brighton on February 12, 1976. <br />The communi ty base map and the topographic mapping used in thi s <br />study were furnished by the City of Brighton. On October 26, 1976, <br />the results of the work by Gingery Associates, Inc., were reviewed <br />at a final community coordination meeting attended by personnel of <br />Gingery Associates, Inc., the FIA, and officials of the City of <br />Brighton, Colorado. <br /> <br />Community base map selection, topographic mapping, and the <br />identification of streams requiring detailed study in the City of <br />Commerce City were accomplished in a meeting attended by personnel <br />of Gingery Associates, Inc., FEMA, the UDFCD, and officials of <br />Commerce City on February 12, 1976. The final community <br />coordination meeting was held on March 7, 1977, at which time the <br />final results of the Flood Insurance Study were presented to city <br />officials and residents. An explanation of the NFIP was made by a <br />representative of FEMA and the results of the Flood Insurance Study <br />were presented by Gingery Associates, Inc. There were no problems <br />with or objections to the study. <br /> <br />The draft report of the detailed study for the City of Federal <br />Heights was discussed at a coordination meeting attended by <br />representatives of the City of Federal Heights, FEMA, and the study <br />contractor on April 25, 1983. Approximate analyses for Federal <br />Heights were approved by FEMA for use in this study. <br /> <br />The final community coordination meeting was held on April 2, 1985, <br />and was attended by representatives of FEMA, the study contractor, <br />and the City. No problems were raised at the meeting. <br /> <br />The community base map for the City of Northglenn was selected and <br />the streams requiring detailed study were identified in a <br />February 12, 1976, meeting attended by representatives of Gingery <br />Associates, Inc., the FIA, the UDFCD, and the City of Northglenn. <br /> <br />During the course of the study, coordination was maintained among <br />representatives of the City of Northglenn, the study contractor, <br />and the FIA, in order to obtain information and keep all interested <br />persons aware of the progress. <br /> <br />A final community coordination meeting was held on July 25, 1977, <br />to discuss the results of the study, and was attended by personnel <br />of the study contractor, the PIA, and the City of Northglenn. No <br />changes or corrections were required as a result of this meeting. <br /> <br />Community base map selection and identification of streams <br />requiring detail study in the City of Thornton were accomplished in <br />a meeting attended by personnel of the study contractor, the FIA, <br />and the UDFCD, as well as officials of the City of Thornton on <br />March 11, 1976. <br /> <br />4 <br />