My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03286
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:50 PM
Creation date
10/4/2006 11:37:40 PM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Wheat Ridge, Arvada
Stream Name
Lower Clear Creek
Basin
South Platte
Title
Major Drainageway Planning
Date
10/1/1981
Prepared For
Adams County
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />VI -2 <br /> <br />TABLE VI-1 <br />JURISDICTIDNAL COST RREAKDOWN SUMMARY <br />FOR IMPROVEMENTS IDENTIFIED IN PHASE B REPORT <br /> <br />TABLE VI-2 <br />UNIT PR ICES <br />(June 1981) <br /> <br /> City of City of Adcrns <br /> Arvada Wheat Ridge County <br /> Item <br />Channel <br />Improvement Costs $ 0 $ 1,431,100 $ 3,915,000 <br />Channel <br />Crossing Costs 0 340,900 1,136,200 <br />Utility Relocation <br />Co st s 0 120,000 188,700 <br />Subtotal Construction <br />Co sts 0 1,892,000 5,239,900 <br />Engineering and Contin- <br />gencies <br />(30% of Construction Costs) 0 567,600 1,572,000 <br />Fiscal, Legal & Adminis- <br />trative <br />(10% of above total) 0 246,000 681,200 <br />Property Acquisition Costs 0 152,400 590,500 <br />Total Improvement Costs <br />(1981 Do 11 ars) 0 2,858,000 8,083,600 <br />MAINTENANCE <br />An nua 1 Operat i onl Ma i ntenance <br />Cost 0 85,300 129,700 <br /> <br />Item <br /> <br />Unit Cost <br />C.Y. $ 3.00 <br />C.Y. $ 2.50 <br />C. Y. $ 350.00 <br />C.Y. $ 250.00 <br />C. Y. $ 30.00 <br />C.Y. $ 18.00 <br />Acre $ 1,800.00 <br />L.F. $ 275.00 <br />S. F. $ 60.00 <br />S.F. $ 100.00 <br />Acre $ 5,000.00 <br /> <br />CHANNEL WORK <br />Excavation <br />Emban kment <br />Reinforced Concrete (Vertical) <br />Reinforced Concrete (Flat) <br />R i pr ap <br />Gravel Filter <br />Grass Seed ing <br />Drop Str uct ure <br /> <br />HIGHWAY BRIDGE REPLACEMENT <br /> <br />RAILROAD. BRIDGE REPLACEMENT <br /> <br />CLEARING, GRUBBING & CLEAN UP <br /> <br />UTILITY RELOCATIONS <br />GAS <br />2" <br />4" <br />8" <br />16" <br /> <br />WATER <br />6" <br />8" <br />12" <br />14" <br /> <br />L.F. $ 15.00 <br />L.F. $ 20.00 <br />L.F. $ 30.00 <br />L.F. $ 50.00 <br />L.F. $ 35.00 <br />L.F. $ 40.00 <br />L.F. $ 45.00 <br />L.F. $ 50.00 <br />L. F. $ 45.00 <br />L.F. $ 60.00 <br />L. F. $ 75.00 <br />L.F. $ 80.00 <br />L.F. $ 85.00 <br />L.F. $ 100.00 <br />S.Y. $ 13.00 <br />C. Y. $ 10.00 <br />Acre $19,000.00 <br />Acre $85,000.00 <br />Acre $108,000.00 <br /> <br />REINFORCED CONCRETE PIPE <br />24" <br />30" <br />36" <br />39" <br />42" <br />48" <br /> <br />ROAD REPLACEMENT <br />Asphalt (2" overlay) <br />Base Course <br /> <br />RIGHT-OF-WAY ACQUISITION <br />Open Space <br />Res ident i al <br />Commercial, Industrial <br />
The URL can be used to link to this page
Your browser does not support the video tag.