My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03190
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:34 PM
Creation date
10/4/2006 11:31:42 PM
Metadata
Fields
Template:
Floodplain Documents
County
Morgan
Community
Weldona
Basin
South Platte
Title
Flood Mitigation Project - Schaefer Draw/South Platte Basin
Date
8/1/1996
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.~ l <br /># I <br />;:AA <br /> <br />IJJ~( ~NGIN~~~ING, I~C. <br /> <br />. R~C~/"~D <br />FE9 2 '1 ~ <br />c~ <br />co;,servo~o W"ler <br />On 80<':;:::1 <br /> <br />February 22, 2000 <br /> <br />Commissioner Mark A Arndt, Chairman <br />Morgan County Board of County Commissioners <br />231 Ensign <br />P.O. Box 59 <br />Fort Morgan, Colorado 80701 <br /> <br />l <br /> <br />VIA: Facsimile & U. S. Postal Service <br /> <br />WRC File: 2032/11 <br /> <br />Dear Commissioner Arndt: <br /> <br />We are in receipt of your letter of February 15,2000, informing us of the County's action to terminate the contract <br />between Morgan County and WRC Engineering, Inc. (WRC) dated February 2, 1999. Needless to say, we were surprised <br />with your action, especially when we have gone overboard in trying to address the County's concerns at a substantial <br />additional cost to WRC. <br /> <br />We respectively disagree with your assessment and conclusions related to WRC's performance as stated in your <br />referenced letter. We believe we have complied with the provisions of the contract For your information, we would like to <br />provide the following that impacted the project schedule and coordination with the Colorado Department of Transportation <br />(COOT). <br /> <br />I. WRC attended 8 meetings at the request of project sponsors as compared to the contract requirements of a total of <br />5 meetings (start-np meeting plus 4 meetings), in order to resolve a variety of issues related to the project <br /> <br />2. The County was unable to provide the boundary surveys for the project, which led to securing the required survey <br />from Bob Bell of High Country Surveying. WRC received fmallocation boundary lines for property ownership and <br />highway right-of-way on October 19, 1999. Two days later, fmal signed and sealed plans were sentto the County. <br /> <br />3. A change in design was requested by the County on July 21,1999, which incurred additional cost to WRC for which <br />we did not bill the County. <br /> <br />4. The contract provides the Colorado Water Conservation Board (CWCB) shall act as the technical project manager <br />and project coordinator. <br /> <br />5. WRC submitted to project sponsors the following: <br />A On July 2, 1999, WRC submitted 5 sets of draft version of the construction drawings to the County for review <br />and distribution. Written comments were received ouly from CWCB and were incorporated in the fmal <br />construction drawings. Verbal comments from the County were received at the July 21"meeting which <br />necessitated major alignment changes. <br />B. On October 6, 1999, a set of specifications was provided to Morgan County, during the meeting with the County <br />Attorney at WRC's offices. <br /> <br />CONSULTING ENGINEERS <br /> <br />950 SOUTH CHERRY STREET. SUITE 404 . DENVER. COLORADO 80246 . (303) 757-8513 . FAX (303) 758-3208 . wrceng@eazy.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.