Laserfiche WebLink
<br />'--./ <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street June 30, 1997 <br />Denver, Colorado 80203 <br />Phone: (03) 866-3441 <br />fAX: (3031866-4474 <br /> <br />STATE OF COLORI\DO <br /> <br />- <br /> <br />Roy Romer <br />Governol <br /> <br />Mr. Mark Arndt, Commissioner <br />Morgan County Government <br />231 Ensign <br />Fort Morgan, Colorado 80701 <br /> <br />Jil.mes 5. Lochhead <br />Executive Director, ONR <br /> <br />DariesC. Lile, P.E <br />Director, (WeB <br /> <br />Dear Mark: <br /> <br />It was a pleasure to meet with you on June 18 regarding the insufficient storm drainage system in <br />Weldona. We have recently received your request for technical assistance in developing an <br />engineering feasibility study to address the drainage problems. <br /> <br />Larry Lang, Chief of the Flood Control and Floodplain Management Section, has informed me <br />that this study will be incorporated into our Section's new work plan. The new work plan will <br />become effective during July 1997. Upon completion, the draft feasibility study will be <br />presented to the County for review and comment. Our staff can readily provide the requested <br />technical assistance free of charge, however we are not a funding agency and do not have the <br />ability to provide grant money for project construction. The County would be responsible for <br />'-.../ making application to various agencies to obtain project funding. <br /> <br />In the meantime, I have performed some preliminary calculations for estimating the peak flow <br />and the culvert sizes for the State Highway 144 crossing. It is my understanding that the CDOT <br />will be paving the highway in the very near future, and the new culverts should be placed before <br />CDOT completes their work. Ideally, a 48" diameter culvert should be placed at the highway <br />crossing near Warren Street if the slope and cover requirements can be met. Otherwise, I would <br />recommend using two 36" or two 30" diameter culverts as the second and third options, <br />respectively. These sizes are based on a lO-year design flow of 90 cubic feet per second (ds) for <br />a 144 acre drainage basin to the north of the town. It was assumed that the area located to the <br />north of the Weldon Valley Ditch does not contribute to the storm runoff in Weldona. <br />Additional improvements will need to made within the town in order to reduce the flooding <br />problems. Those improvements will be addressed in the feasibility study. <br /> <br />If you have any questions regarding this issue, please contact me at (303) 866-3441. <br /> <br /> <br />Tbem.al> W. Browning, P.E. <br />Flood Control and Floodplain Management Section <br /> <br />'--"- <br /> <br />c:\seca\projects\weldona\letr-l.doc <br />