Laserfiche WebLink
<br />. Action Items: <br /> <br />. CWCB should set up a review meeting for mid-January. The meeting should be held on a <br />Wed., Thurs., or Friday to accommodate the schedules of the County Commissioners and <br />staff. County staff will invite all interested landowners to the meeting. <br /> <br />. County staff will locate and obtain copies of maps that show existing drain tiles in the <br />Weldona area. <br /> <br />. County staff will contact the owner of the old scale (located just south of highway 144 at <br />Weldona) and determine if the scale can be relocated. <br /> <br />. WRC Engineering will analyze the levee alternative (north side of Weldona) for the "with" <br />and "without" reservoir flood flows. <br /> <br />. CWCB staff will investigate a new alternative which includes several small detention <br />reservoirs in the upper part of the watershed. <br /> <br />. The CWCB will ask the Corps of Engineers to investigate a new alternative which may <br />include diversion levees/channels that would direct flood flows away from Weldona. <br /> <br />. <br /> <br />C:\secalflood\weldona\minutes 12-29.doc <br /> <br />. <br />