Laserfiche WebLink
<br />. <br /> <br />Table 19 <br />Cost Apportionment Under the President's Proposed Policies <br /> <br /> Federal Costs Non-Federal Costs <br /> First Annual First Annual <br /> Components Costs OM&R Costs Costs OM&R Costs <br />Downstream Channel <br />and Drainage <br />Improvements $ 6,665,000 $ 5,000 <br />Modifications to <br />Kelly Road Dam $1,246,0001/ $ 2,000 62,000 <br />Upper Lowry Dam 4,865,000 11 32,060 l,622,OOO <br />Channel Improve- <br />ments - Upper <br />Lowry Dam <br />Go If Cour se <br />Drainage <br />Channel l88,OOO 2,000 <br />South Drainage <br />Channel 34l,OOO 2,000 <br />Drainage Improvements - <br />Upstream from Lowry <br />Air Force Base 3,320,000 13 ,000 <br />Totals $6,lll,OOO 1/ $34,000 $l2,l98,OOO $22,000 <br /> <br />II Does not include value for lands which are already federally <br />owned. This value would be $445,000 for Kelly Road Dam and <br />$3,040,000 for Upper Lowry Dam, a total of $3,485,000. The <br />total Federal investment, including land value, would be <br />$ll,280,OOO, which also includes $l,060,OOO for the emergency <br />measures on Kelly Road Dam which have already been completed. <br /> <br />65 <br /> <br />. <br />