Laserfiche WebLink
<br />. <br /> <br />Table l8 <br />Cost Apportionment Under Existing Policy <br /> <br /> Federal Costs Non-Federal Costs <br /> First Annual First Annual <br />Components Costs OM&R Costs Costs OM&R Costs <br />Downstream Channel <br />and Drainage $ 6,665,000 $ 5,000 <br />Improvements <br />Modifications to <br />Kelly Road Dam $1,308,000 1/ $ 2,000 <br />Upper Lowry Dam 6,487,0001/ 32,000 <br />Channel Improve- <br />ments - Upper <br />Lowry Dam <br />Golf Course <br />Drainage <br />Channel l88,OOO 2,000 <br />South Drainage <br />Channel 34l,OOO 2,000 <br />Drainage Improvements - <br />Upstream from Lowry <br />Air Force Base 3,320,000 13 ,000 <br />Totals $7,795,0001/ $34,000 $lO,5l4,OOO $22,000 , <br />, <br /> <br />1/ Does not include value for lands which are already federally <br />owned. This value would be $445,000 for Kelly Road Dam and <br />$3,040,000 for Upper Lowry Dam, a total of $3,485,000. The <br />total Federal investment, including land value, would be <br />$ll,280,OOO, which also includes $1,060,000 for the emergency <br />measures on Kelly Road Dam which have already been <br />completed. <br /> <br />63 <br /> <br />. <br />