Laserfiche WebLink
<br />w <br />..... <br /> <br />. <br /> <br />Objectives <br /> <br />Assure safety of <br />Kelly Road Dam <br /> <br />Reduce flood <br />damage hazard <br />downstream from <br />Kelly Road Dam <br /> <br />Keep future flood <br />hazard from increas- <br />ing downstream from <br />Kelly Road Dam <br /> <br />Al1evia'te drainage <br />problems upstream <br />from Highline Canal <br /> <br />- <br />Mitigate effects of <br />residual flood <br />haza rds <br /> <br />Table 6 <br />Contribution to Plan Objectives <br /> <br />Flood Storage <br />on Lowry AFB <br /> <br />Yes <br /> <br />Yes, would provide <br />$l,589,OOO in average <br />annual benefits <br /> <br />No <br /> <br />No <br /> <br />No <br /> <br />"""" <br /> <br />Components <br />Channel <br />Improvements <br />Downstream from <br />Kelly Road Dam <br /> <br />No <br /> <br />Yes, would provide <br />$704,000 in average <br />annual benefits <br /> <br />No <br /> <br />No <br /> <br />No <br /> <br />Drainage <br />Improvements <br />Upstream <br /> <br />No <br /> <br />No <br /> <br />No <br /> <br />Yes <br /> <br />No <br /> <br />Flood Plain <br />Management <br /> <br />No <br /> <br />No <br /> <br />Yes <br /> <br />No <br /> <br />Yes <br /> <br />. <br />