My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02939
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:52 PM
Creation date
10/4/2006 11:21:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Otero
Basin
Arkansas
Title
Otero County Storm Water Drainage Improvements
Date
2/6/2002
Prepared For
Otero County
Prepared By
Department of Engineering, Land Use and Building
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Colorado Project No. NIl 0504-042 <br />SH 50 at Rocky Ford <br />Construction Subaccount No. 13561 <br /> <br />7/2/01 <br /> <br />-3- <br />TRAFFIC CONTROL PLAN - GENERAL <br /> <br />MISCELLANEOUS <br /> <br />All vehicle parking within 40 feet from the edge of travel lane will not be permitted. <br /> <br />The Contractor shall supply portable radios, as required for traffic and safety control. The radios shall have <br />sufficient range to communicate throughout the entire work day. Flaggers, Traffic Control Supervisors, and Project <br />Manager will be supplied with radios as required. Traffic Control Supervisor shall have mobile cellular phone at all <br />times. <br /> <br />Whenever the Contractor removes, obliterates, or covers in any way; signs and pavement markings, they shall be <br />replaced on a daily basis prior to opening affected areas to traffic. All pavement marking shall be placed in <br />accordance with the Contract. <br /> <br />All costs incidental to the foregoing requirements shall be included in the original contract prices for the project, <br />including any additional traffic control items required for haul routes into or away from the project. <br /> <br />During the construction of this project, traffic shall use the present traveled roadway. <br /> <br />During the shouldering work, only one lane may be closed to traffic at any time. Traffic shall no1 be delayed for <br />more than 10 minutes or as directed by Engineer. <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.