Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Colorado Project No, NH 0504-042 <br />SH 50 at Rocky Ford <br />Construction Subaccount No, 13561 <br /> <br />7/2/01 <br /> <br />SPECIAL CONSTRUCTION REQUIREMENTS <br /> <br />Following are special construction requirements for this project: <br /> <br />I. The Contractor shall maiotaio drainage duriog construction_ The proposed method shall be approved by <br />the Engineer. The cost of all temporary measures to provide adequate drainage during construction shall <br />not be paid separately, but shall be included in the cost of the work_ <br />2_ The contractor shall clean debris, sediment and obstructions from ditches along the project limits_ The <br />extent of ditch cleaniog and the locations of ditches to be cleaned shall be as directed by the engineer. The <br />cost of ditch cleaning and the removal of material cleaned from the ditches shall not be paid separately, but <br />shall be included in the cost of Clearing and Grubbing (Lump Sum), <br />3_ For the cleaning of concrete lined ditches, any damage to the ditch lining shall be repaired by the contractor <br />at no cost to the project. <br /> <br />21 <br />