My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02939
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:52 PM
Creation date
10/4/2006 11:21:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Otero
Basin
Arkansas
Title
Otero County Storm Water Drainage Improvements
Date
2/6/2002
Prepared For
Otero County
Prepared By
Department of Engineering, Land Use and Building
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Colorado Project No. NH 0504-042 <br />SH 50 at Rocky Ford <br />Construction Subaccount No. 13561 <br /> <br />. GENERAL <br /> <br />7/2/01 <br /> <br />The Contractor shall comply with Article 1.5 of Title 9, CRS ("Excavation Requirements"), when excavation or <br />grading is planned in the area of underground utility facilities. The Contractor shall notify all aflected utilities at <br />least two (2) business days prior to commencing such operations. Contact the Utility Notification Center of <br />Colorado (UNCC) to have locations ofUNCC-registered lines marked by member companies. Call 1-800-922-1987 <br />for locate requests outside the Denver Metro area. All other underground facilities shall belocated by the contacting <br />the respective company. Utility service laterals shall also be located prior to beginning excavation or grading. For <br />locations of CDOT-owned underground facilities, contact the person shown above. <br /> <br />The location of utility facilities, as shown on the plans and profile sheets and described herein, were obtained from <br />the best available information. <br /> <br />All costs incidental to the foregoing requirements will not be paid for separately, but shan be included in the work. <br /> <br />. <br /> <br />. <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.