Laserfiche WebLink
<br /> Page 2 <br />. Engineers Estimate for Rocky Ford <br />Lower 48" Option <br />Item Description Unit Quantity Unit Price Cost <br />202 Removal ofStruc. & Obstr. LS I $ 10,000.00 $ 10,000.00 <br />603 18" RCP (CIP) LF 75 $ 100.00 $ 7,500.00 <br />603 36" RCP (CIP) LF 340 $ 120.00 $ 40,800.00 <br />603 48" RCP (CIP) LF 640 $ 140.00 $ 89,600.00 <br />604 Inlet Type C (10') Each I $ 3,000.00 $ 3,000.00 <br />604 Manhole Slabbase (10") Each 2 $ 3,000.00 $ 6,000.00 <br />609 Curb (Type 6M) LF 500 $ 8.00 $ 4,000.00 <br /> Subtotal $ 160,900.00 <br /> Item 626: Mobilization (10%) $ 16,090.00 <br /> Subtotal $ 176,990.00 <br /> Construction Oversite (18%) $ 31,858.20 <br /> TOTAL $ 208,848.20 <br /> <br />NOTE: The above price includes 36" pipe installation from the current end ofthe treeIined canal to the <br />manhole on the east side of CR 19 which was not originally included in the draft set of design plans <br />previously distibuted. <br /> <br />. <br /> <br />. <br />