My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02939
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:52 PM
Creation date
10/4/2006 11:21:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Otero
Basin
Arkansas
Title
Otero County Storm Water Drainage Improvements
Date
2/6/2002
Prepared For
Otero County
Prepared By
Department of Engineering, Land Use and Building
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />STATE OF COLORADO <br /> <br />COWRADO DEPARTMENT OF TRANSPORTATION <br /> <br />Region 2, South Program Unit 2210 <br />905 Erie Avc:oue <br />Pueblo, CO 81001 <br />(719) 546.5437 <br />FAX (719) 54<i-5702 <br /> <br />~~~ <br /> <br /> <br />l)fJ'MI'IIIIPTOF~TDI <br /> <br />NH 0504-042 <br />Otero County Flood Project <br />Subaccount: 13561 <br /> <br />January 31, 2002 <br /> <br />Mr. Darryl Schulz, Public Works Director <br />Otero County <br />Department of Public Works <br />P.O. Box 511 <br />La Junta, CO 81050 <br /> <br />RE: Rocky Ford 48" Proposed FEMA Drainage Improvements <br /> <br />Darryl, <br /> <br />I have reviewed the project in the Rocky Ford area as you requested. I have analyzed the lower 48" run and prepared a <br />preliminary estimate for the costs for the smaller scale project to fit the limited budget. I am also recommending some <br />additional 36" pipe to improve the overall effectiveness of the smaller scale projecL <br /> <br />Enclosed is the cost estimate that I prepared for the proposed improvements. This includes installing the lower portion of <br />the 48" pipe from the inlet on County Road 19 to the concrete ditch, installing the inlet on County Road 19 south of the <br />Rocky Ford Canal, and installing curb along the east side of County Road 19 originally included in the full project. To <br />further enhance the effectiveness of these limited improvements, instaIlation of a 36" pipe from the terminus of the <br />existing treelined ditch to the manhole on County Road 19 south of the Rocky Ford Canal has been added <br /> <br />These improvements along with the improvements CDOT has proposed in this area will provide a minimum decreased <br />water depth in the area between eastbound and westbound US 50 of 8inches based on a 5-year storm event. With the <br />addition of the 36-inch pipe, the water depth will be further reduced. Per the attached estimate, these improvements are <br />estimated to cost approximately $200,000.00. <br /> <br />If you have any questions, please call me at 719-546-5438. <br /> <br />Sincerely, <br /> <br />Andrew D. Garton, PE <br />Resident Engineer <br /> <br />xc: <br /> <br />Torres (R2 RTD) <br />Wrona (R2 SPE) <br />Garton (2210 RE) / File <br />Cunha <br />
The URL can be used to link to this page
Your browser does not support the video tag.