My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02939
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:52 PM
Creation date
10/4/2006 11:21:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Otero
Basin
Arkansas
Title
Otero County Storm Water Drainage Improvements
Date
2/6/2002
Prepared For
Otero County
Prepared By
Department of Engineering, Land Use and Building
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0Ier0 County <br />2. <br /> <br />l'age 10 21b12OOJ. <br /> <br />Is tlw jt!Jisdictionloommunity unde:!' "investigfttio,," fur (OR SllSpected of) oolK'.ompliallr.('! issll!'!S <br />which, ifverified, could result in the community/jurisdiction being placed on "probation" or <br />"suspension" with the NFIP? <br />NO <br /> <br />. <br /> <br />C, Is this project located in a floodplain or floodway designated on a FEMA Flood Insurance Rate Map <br />(ARM) or Flood Boundary/Floodway Map (FB/FWM)? NO <br /> <br />a. FIRM (FB/FWM) Panel NUIIlber: N/A <br />b. FIRM Zone Designation: N/A <br />c, NFIP Community ID NUIIlber: 080 132 <br /> <br />E. Name, address. phone, and FAX # of the local Floodplain Administrator/Manager: <br /> <br />a. Name: Darryl SeIlulz <br />b, Address: POBox 511, La lUDta, CO 81050 <br />c. Phone # 719-J83..3038 FAX # 719-383-3935 <br /> <br />E, Is the applicant also applying for a Flood Mitigation Assistance Program (FMAP) mitigation grant fOf <br />this, or any other project in the area oftbis proposed project? NO <br /> <br />F. If "Yes", provide pertinent infonnation as to current status of the application and a point of contact, <br /> <br />. Local Approval of Project: <br /> <br />1. Specify the amount oflocal funds available for this project: SO <br /> <br />2, Specify any local commitment available for the project, Funds: SO <br /> <br />3, Other Resources (including "in_kind" services): "Letters of Funding Commitment" (if any) from <br />non-FEMA funding sources. See attached COOT ud other letten of commitmeDt part 13 at <br />tab Xl <br /> <br />4. By what date will the entire NON-FEMA share of the project costs be available to the applicant? <br />May 15, 2000 <br /> <br />5, Project Maintenance over Useful Life: <br />a. Does project require periodic maintenance? Yes <br />b. If "Yes", will the applicant provide the maintenance? Yes <br /> <br />If 'Yes", describe how will the applicant financiallY provide for maintenance. Tbe County will inspect the <br />improvemeuts on a semi-aODual basis aDd will coordiDate with Colorado Department of Transpor1l!tion <br />to iDsure the maintenanee belag done over the project's useful life. MOlley will budget Oil all anllual basis <br />for the maintenanee. <br /> <br />. <br /> <br />6, <br /> <br />A letter from the state's Community Assistance Program Coordinator and from the local <br />floodplain administrator/ma"llger, To be provided by ewCR, Local attached at Part 13 at <br />tab 6 <br />(ONLY IF THE ANSWER .() EITHER QUESTlONBI OR B3 ABOVE IS "YES~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.