My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02939
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:52 PM
Creation date
10/4/2006 11:21:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Otero
Basin
Arkansas
Title
Otero County Storm Water Drainage Improvements
Date
2/6/2002
Prepared For
Otero County
Prepared By
Department of Engineering, Land Use and Building
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Otero County <br /> <br />Page 11 <br /> <br />2/612002 <br /> <br />. <br /> <br />PART 10 <br /> <br />Environmentallnformation <br /> <br />A Have you completed state and local environmentallawslrequiremeDts? We are workblg witb the <br />agencies to .....re the project compUes with aU laws and requirements. <br /> <br />B. Have you applied for any required environmental permits or requested comments from various state or <br />federal agencies? Attach copies of your letters after Part 13 Tab 7. Letters have been IIent to the <br />following ageueies. <br /> <br />.c, <br /> <br />. U.s. Army Corps ofEngilleers' Clean Water Act: <br />. State Historic Preservation offiee: <br />. State Dept. of Euvironment " Natural Resources: <br />. UoS. F'mh and Wildlife Services <br />. Colorado WatereoaservatiOll Board <br />. FEMA <br />. Colorado Biatorieal Society <br /> <br />Is the ReconnaissancelReview Report for Floodplain Management (FEMA Form 90-62, Aug 84) <br />attached? No, will be supplied ifrequired for this project. <br /> <br />(NOTE: 850. of all delays in application processing are directly due the failure of the applicant to answer the <br />Wl1ainder of Part lOin sufficient detail. This lack of detail willcause the application to be placed on hold until <br />the applicant supplies the needed detail to sufficiently answer the following questions, Experience bas shown <br />that by the time the needed information is obtained and the application again actively processed, 3-6 months <br />could have passed] <br /> <br />D. Executive order 12898, Federal Actions to Address Environmental Justice in Minority Populations and <br />Low-Income Populations: <br /> <br />I. Identify and describe the type and number of minority populations in the project area, <br />· White 58.0".4 <br />. IlilpaBie 38.7% <br />. Native American 0.6% <br />· Blaek 0.8% <br />. Asian 0.6% <br />. Other 0.5% <br /> <br />. <br /> <br />2. <br /> <br />Identify and describe the type and nmnber of low-income populations in the project area. <br />Otero County bas 7434 total persoDS for whom poverty status Is determlDed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.