Laserfiche WebLink
<br /> <br />DFA 0055 <br /> <br />. Direct Flow Channel. Provide a grass-lined channel with 1 OO-year capacity from Belle <br />Creek development upstteam under 1-76 to the confluence of Arsenal North and UPRR <br />Tributaries. Provide crossing structures for the IOO-year discharge at 104'" Ave., US 85 <br />and 1-16. <br />. Arsenal NOrlh Drainage. Provide a grass-lined channdwith 100-year capacity from <br />Dire-ct Flow Channel upstream to the Rocky Mountain Arsenal, following [he alignment <br />depicted on Figure 8.. page iii, of Report. Provide crossing structures for the IOO-year <br />discharge at the UP Railroad. Burlington Di:ch, O'Brian Canal. Havana. SH 2 and 95'1 <br />Ave. <br />. Elm Drainage. Provide a grass-lined channel with lOO-year capacity from Arsenal North <br />Drainage Channel upstream to the Rocky MowllainArsenal, following the alignment <br />depicted on Figure B, page iii, of Report. Provide crossing structures for the IOO-year <br />discharge a.t 96" Ave. and SH 2. <br />. Union Pacific Tributary_ .Provide a pass-lined channel with I OO-year capacity from <br />Arsenal North Drainage Channel upsrream to 96'h Av~., following the alignment depicted <br />on Figure 8, page iii, of RepOrt. Provide a crossing SIt1lcture for the lOO-year discharge at <br />96'h'Ave., . <br />. Rolla Tributary. Provide a grass-lined channel with IOO-year capacity from Arsenal North <br />Draill2ge Channel upstream to 96'h Ave.. following the alignment depicted on Fi~ure B. <br />page iii. of Report. Provide a crossing structure for the IOO-year discharge ar 96' A vc:. <br />. Birch Tribulary. A grass-lined channel with lOO-year capacity has been consrrucrcd <br />parallel to Dallas St. Provide a crossing structure for the lOO-year discharge at 96'h Ave. <br />. What lype of grass-lined channel do we want? <br />. Optimize crossing structure type (bridge vs. culvert) ilnd dimensions. <br />. Recommend noodplain management of the IOO-y::ar floodplain based on fiJIly developed <br />(i.e., future) land use projections a5 a minimum, until channel capacities are increased or <br />I OO-year discharges are decreased. Then manage the residual floodplains. <br /> <br />"This drawing is for master planning purposes and represents preliminary and <br />concepr'lal engineering. Alternatives ro rhis outfall S) 'stem wiff be considered by <br />local agencies and Ihe Urban Drainage and Flood C{.ntrol District provided the <br />alternative offtx! an equivalent hydraulic capacity and stream stability, The <br />alternative must comply with all requireml!nts of rhe 1.?Cal jurisdiction and the <br />Uroan Drainage and Flood Contra! District. This drawing shalt not be usedfor <br />construction purposes. III addition. there may be State and Federal requiremenrs <br />. that will need to be considered ond met. This drawing is not 0 flno! design ond <br />shall nor be usedfor constnlction purposeS. " <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br /> <br />floodplain from SH2 to 96th Ave. Provide crossing Slnlctures for !he detained 1 CO-year <br />discharge ,at SH 2 and 96<10 Ave. Consider relocating Peoria St to the lop of the proposed <br />Maul R~er-'oir embankment Items to be considered include the added embankment <br />width required for a road and how a spillway worles ~ith a road. <br />. Optimize crossing strUcture type (bridge vs. culvert) and dimensions. <br />. Recommend floodplain management of the IOO-year tloodplain based on fully developed <br />(i.e., lUture) land use projections as a minimum, until chann~1 capacities are increased or <br />IOO_year discharges are decreased. <br /> <br />Commerce City; Provided Review and Input. Or X)(X."'( attended progress meetings and <br />,provided the following input:~. <br />. lnclude a specific section in the repon which discusses the best way to phase <br />irnpl'ementation to achieve the greatest benefitS at the earliest possible time. This will <br />include, but nOI be limited to, early implementation of Maul Reservoir to be used initially <br />for more frequent events and water quality; and later for 1 OO-year peale flow reduction. <br />. Channel right-of-way should be clearly delineated on the drawings included in the <br />Preliminary Design Report. <br />. A maintenance-access trail or route should be shown along all outfalls and drainageways. <br />To the extent feasible, the alignment of these trails should be coordinated with existing <br />and planned recreational trails identified using input provided by Commerce City and <br />Adal"t1S County park departments. <br />. Report cost estimates of improvements based on the j'llisdiclion where those <br />improvements are located'as well as in which reach. ' <br />. Unit costs should be updated to reflect the most current costs available. <br />. Report cost estimates for maintenance of detention facilities, channels, and Storm sewer <br />systems in the preliminary design. <br />. Show these 'notes on each sheet of the drawings: <br /> <br />"Adams County and Commerce City manage and reg;l/ate all land use change. <br />development Clnd red<?Ve!opmenr activities within the .'OO-year floodplains in order <br />10 preventfurureflood damages to buildings and stru,~t!lresfrom the IOO-year <br />flood to a mCL,imum extent possible, and to minimize dal7lr;rgesfrom larger floods. <br />The recommendariol'lS of this plan provide a set of options subscribed to by Adams <br />COflnry and Commerce City in carrying out their floodplain monogemenr and <br />regulatory respo1'\Sibiliries and obligarions. .. <br /> <br />ADlllTJONAL DlRECTIO:\' <br /> <br />EXECUTIVE SUMj'.l"ARY <br /> <br />The following additional information should be included in th: final report. <br />. Include an Acknowledgemems section listing all participants in the planning study. <br />Include in the list their narne, organization and function in the planning process (e.g., <br /> <br />Include an Executive Summary in the Preliminary Design Report. Direct this summary at the. <br />. general public and elected officials. This summary should, at the minimum, contain: <br />. A brief summary of the planning process including the numbers of progress and public <br />meetings. <br /> <br />Sdccld PI,,: Lower Firsr C,~.k ~aur.,I"d 2 <br /> <br />StltCl~d Plan: Lower FI,.<r Creek W"te,shed 3 <br />