<br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I-- <br />I <br />I <br />I <br />I <br /> <br />Table 2 <br />Pipestone, Minnesota <br /> <br />Conceptual Improvements <br />Preliminary Cost estimates <br /> <br /> 1DO-vr Channellmprovemenls with 1lJO.vr l8v_ <br /> Item Unit UnIt coat Quantity Cost <br />1. Excavation and Placement as Fill (Main Dijch) CY $4 12,000 $48,000 <br />2. Excavation and Placement as Fill (Diversion Chan.) CY $4 135,000 $540,000 <br />3. Excavation and Spoil 0n-S1Ie CY $4 122,000 $488,000 <br />4. Excavate New Channel and Fill Old Channel CY $3 19,000 $57,000 <br />5. 30" RCP Culverts LF $50 150 $7,500 <br />6. 33" RCP Culverts LF $60 300 $18,000 <br />7.54" RCP Culverts LF $140 150 $21,000 <br />8. 30" Flap Gales EA $3,000 3 $9,000 <br />9. 33" Flap Gates EA $3,500 6 $21,000 <br />10. 54" Flap Gales EA $8,000 3 $24,000 <br />11. Obi 18' by 8' Cast~n-Place Concrete Box Culvert CY $400 233 $93,200 <br />12. Headwalls and Wingwalls for RCB Culvert CY $400 27 $10800 <br /> Subtotal $1,337,500 <br /> 25% Contingency $334,375 <br /> Total CCl8t $1,671,875 <br /> <br /> 100-vr Channel Improvements with 500-vr l8v_ <br /> Item Unit Unit Cost Quantity CCl8t <br />1. Excavation and placement as Fill (Main Dijch) CY $4 134,000 $536,000 <br />2. Excavati.on and placement as Fill (Diversion Chan.) CY $4 135,000 $540,000 <br />3. Fumish and Place Fill Material CY $8 41,000 $328,000 <br />4. Excavate New Channel and Fill Old Channel CY $3 19,000 $57,000 <br />4. 30" RCP Culverts LF $50 150 $7,500 <br />5. 33" RCP Culverts LF $60 300 $18,000 <br />6. 54" RCP Culverts LF $140 150 $21,000 <br />7.30" Flap Gales EA $3,000 3 $9,000 <br />8. 33" Flap Gates EA $3,500 6 $21,000 <br />9, 54" Flap Gates EA $8,000 3 $24,000 <br />10. Dbl1S' by 8' Cast-in-Place Concrete Box Culvert CY $400 233 $93,200 <br />11. Headwalls and Wingwalls for RCB Culvert CY $400 27 $10800 <br /> Subtotal $1,665,500 <br /> 25% Contingency $416,375 <br /> Total Cost $2,081,875 <br /> <br />Note: These cost estimates do not indude the costs for bridge impfO'lel11ents that would be required <br />in order to achieve the specified levels of protection. Construction of the levees upstream of 9th Street NE <br />without the bridge improvements is not recommended. <br />