Laserfiche WebLink
<br />a. office and 24 hr telephone number <br />b. name of alternates <br />c. which officials should be contacted first <br />d. at what point officials should be called <br />e. how messages should be worded <br /> <br />5. Does the plan describe the communication system? <br /> <br />a. normal conditions <br />b. backup <br />c. are radio call numbers and frequencies included? <br />for own radios <br />for those to be notified <br /> <br />6. Does the plan include procedures for downstream warning? <br /> <br />a. availability of equipment <br />b. levels of responsibility for the warning <br />c. downstream operators <br />d. other dams <br />e. industries <br />f. other agencies <br />g. recreational users <br /> <br />D. Local Coordination <br /> <br />1. Was the development of the plan coordinated with local officials <br />during the planning phase? <br /> <br />a. agency input into plan <br />b. integration into the local plan <br /> <br />2. Do the inundation maps provide sufficient information and <br />explanation? <br /> <br />a. is language understandable, <br />b. are terms explained, <br />c. is map usage explained, <br />d. are criteria explained, <br />e. is travel time shown, <br />f. are hazardous elevations shown, <br />g. is flood plain information available. <br /> <br />E. Resources <br /> <br />1. Are resources adequately identified <br /> <br />a. equipment and sources specifically described including the <br />contact name and telephone number <br />b. supplies and suppliers specifically described including the <br />name of the contact and telephone number <br /> <br />23 <br />