My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02368
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:14 PM
Creation date
10/4/2006 10:51:07 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Office of the State engineer Rules and Regulation for Dam Safety Construction
Date
8/26/1988
Prepared For
State of Colorado
Prepared By
Office of The State Engineer
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />16.A.(4) A topographic map for Class II dams showing the <br />stream which will be flooded; and, <br /> <br />16.A.(5) A procedHre for warning nearby local residents if <br />failure of the dam is imminent. <br /> <br />16.8. The owner shall use the State Engineer's model EPP, which <br />is available at no cost, or equivalent, for guidance in preparing the <br />details of the components above. <br /> <br />16.C. The owner shall submit a copy of the proposed <br />Colorado Division of Disaster Emergency Services (DOD~S) <br />emergency coordinators involved in the plan for reVlew. <br />shall incorporate reasonable recommendations from the <br />received within sixty days of the submittal. <br /> <br />EPP to the <br />and all local <br />The owner <br />above, if <br /> <br />16.D. The owner shall review and update the EPP as necessary <br />annua 11 y. <br /> <br />Rule 17. Fees: <br /> <br />17.A. The owner shall submit with the application for construc- <br />tion, enlargement, alteration, modification, or repair an amount equal <br />to two dollars for each one thousand dollars or fraction thereof of <br />the estimated cost of construction including engineering costs, but <br />the maximum fee shall not exceed $200. When an owner resubmits an <br />application which was previously received and disapproved by the State <br />Engineer, the owner shall submit a new filing fee in accordance with <br />the above. Checks shall be made payable to the Colorado Division of <br />Water Resources. <br /> <br />17.8. Pursuant to Sections 37-87-106 and Ill, C.R.S. (1973)(1987 <br />Supp.), the dam owner shall be responsible for payment of invoices <br />from the State Engineer for safety inspections and construction <br />observation. The invoice shall include actual salary, travel, sub- <br />sistence, and itemized extraordinary expenses at prevailing rates for <br />state officers and employees not to exceed $125 per day per dam or <br />reservoir. The total charge to one owner shall not exceed $125.00 per <br />day. The payment is due within 30 days of receipt of the invoice. <br /> <br />- 46 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.