Laserfiche WebLink
<br />1998 CASFM CONFERENCE, Steamboat Springs, September 30th. October 2nd <br /> <br />e <br /> <br />Technical Session: Floodplain Management 201 <br /> <br />Floodplain Management in a Rapid Growth Environment <br /> <br />by Donald W. Glondys, Woodward-Clyde Federal Services <br /> <br />Outline <br /> <br />I. Backaround (15 min) <br /> <br />A Understanding the regulatory requirements: <br />1. FEMA <br />2. State <br />3. Local <br /> <br />B. Potential conflicts between State and Federal requirements (Le. Colorado <br />defined f1oodway) <br />C. Permit process <br />D. Cooperative effort between Permitters and Permittees <br /> <br />e <br /> <br />II. <br /> <br />Floodplain Management Tools (20 min) <br /> <br />A. FEMA maps - brief review of map FIRMlFBFM content and use <br />B. FEMA FIS <br />C. Other floodplain studies <br />D. Topographic maps <br />E. Local knowledgelhistory - know where the problem areas are located <br />F. Master drainage plans <br />G. Mitigation plans <br />H. Regulations <br />I. Resources <br /> <br />III. Impact of a Rapid Growth environment on floodplain management (10 min) <br /> <br />A. Keeping up with the changes <br />B. Maintaining a solid program under development pressures <br />C. Accelerating the permit process - is it pOSSible? <br /> <br />e <br />