My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02112
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD02112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 10:41:25 AM
Creation date
10/4/2006 10:37:28 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Title
1993 Colorado Flood Report
Date
6/1/1994
Prepared For
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />14 <br /> <br /> <br />A. PREPARATION <br /> <br />The first phase of slate agency actions involved preparation for potential spring flooding. The <br />eWCB. the Colorado Office of Emergency Management. the State Engineer's Office and the Colorado <br />Geological Survey were all actively involved in the process. <br /> <br />March 1993 <br /> <br />In mid-March. lhe CWCB staff sent correspondence to over 40 wesl slope and San Luis Valley <br />communities, The leller notified communities that the increasing winler snowpack had the possibility of <br />causing flood problems during the spring runoff months (May-June). It offered 1) assistance to identify <br />locally flood lhreatened areas. and 2) recommendations 10 mitigale flood problems should they be realized. <br />Response from the communities was significant. And as a result of this response, reconnaissance field trips <br />were scheduled for April for flood-threatened coml1lunities. <br /> <br /> <br />NOII-Ellgilleered l.el'ee at D%res, Colorado Oil tire D%res Ril'er <br />
The URL can be used to link to this page
Your browser does not support the video tag.