Laserfiche WebLink
<br />14 <br /> <br /> <br />A. PREPARATION <br /> <br />The first phase of slate agency actions involved preparation for potential spring flooding. The <br />eWCB. the Colorado Office of Emergency Management. the State Engineer's Office and the Colorado <br />Geological Survey were all actively involved in the process. <br /> <br />March 1993 <br /> <br />In mid-March. lhe CWCB staff sent correspondence to over 40 wesl slope and San Luis Valley <br />communities, The leller notified communities that the increasing winler snowpack had the possibility of <br />causing flood problems during the spring runoff months (May-June). It offered 1) assistance to identify <br />locally flood lhreatened areas. and 2) recommendations 10 mitigale flood problems should they be realized. <br />Response from the communities was significant. And as a result of this response, reconnaissance field trips <br />were scheduled for April for flood-threatened coml1lunities. <br /> <br /> <br />NOII-Ellgilleered l.el'ee at D%res, Colorado Oil tire D%res Ril'er <br />