Laserfiche WebLink
<br />., <br />F <br />, <br />~ <br />'- <br /> <br />c <br /> <br />'""" <br />J\- <br /> <br />f~ <br /> <br />XIV - SCHEDULE FOR DESIGN AND CONSTRUCTION <br /> <br />14-01. Design schedule. Design Memorandum No.1, HYDROLOGY, was sub- <br />mitted 3 October 1967. Information on design memoranda for the project <br />is included on the flyleaf of this report. The schedule for design and <br />construction is presented on plate.35. <br /> <br />14-02. Construction schedule. With a budgeted construction start <br />proposed for FY 1969, the estimated construction time would be 12 months. <br />A proposed s~edule of Federal construction operations showing their <br />sequence, the time required for completion of the principal elements, <br />and a cost schedule are presented on plate:35. Also shown on plate''''- <br />is a schedule of Non-Federal participation in the construction of this <br />project. <br /> <br />14-03. Funds required. Federal funds that would be expended and <br />required by fiscal years for project planning, design, supervision and <br />administration and construction are shown on platc3~ and are summarized <br />below. <br /> <br />FISCAL YEAR TOTAL <br />1961. and 1968 $ 196,000 <br />.~ <br />1969 24,000 <br />1970 346,000 <br />1971 1,374,000 <br />TOTAL $1,940,000 <br /> <br />47 <br />