Laserfiche WebLink
<br />t <br />~. <br />~ <br />~( <br />~ <br /> <br />TABLE 8. (CONT'd.) <br /> <br />NON-FEDERAL COST <br /> <br />LANDS AND DAMAGES : <br /> <br />Fee, (industrial, city, farm, grazing and ~asteland) <br />Easement, (borrow, spoil, flowage-ponding and, <br />temporary construction) <br />Severance <br />Acquisition and Administration <br />Contingencies <br /> <br />TOTAL-LANDS AND DAMAGES <br /> <br />RELOCATIONS: (From Table 1, Appendix B) <br /> <br />Construction by Local Interest <br />Construction by Corps of Engineers <br />Contingencies <br /> <br />TOTAL-RELOCATIONS COST <br /> <br />Engineering and Design <br />Supervision and Administration <br /> <br />TOTAL NON-FEDERAL COST <br /> <br />TOTAL PROJECT COST <br /> <br />l <br /> <br />46 <br /> <br />$ 29,750 <br /> 9,020 <br /> 8,000 <br /> 10,000 <br /> 5,230 <br />$ 62,000 <br /> <br />$ 119,830 <br /> 14,630 <br /> 32,920 <br />'. ~ 167,380 <br /> 8,690 <br /> 11,930 <br />$ 250,000 <br />$2,190,000 <br /> <br />r <br /> <br />~, <br />t, ' <br />'".. <br />,'fIr <br /> <br />j <br />~::,. <br />