Laserfiche WebLink
<br />f <br />~ <br />'. <br />~;t <br /> <br />" <br />~ <br />;>.. <br /> <br />TABLE S(CONT'D.) <br /> <br />( <br /> <br />Cost' <br />Acct. <br />No. <br /> <br />Item <br /> <br />Unit Quantity Unit Cost Item Cost <br /> <br />13. SEWAGE PUMPING PLANT: <br /> <br />Job <br /> <br />Sewage pumping plant <br /> <br />Contingencies <br /> <br />TOTAL-SEWAGE PUMPING PLANT <br /> <br />TOTAL-FEDERAL CONTRACT COST <br /> <br />30. ENGINEERING AND DESIGN <br /> <br />31. SUl'ERVISION AND ADMINISTRATION <br /> <br />TOTAL FEDERAL COST <br /> <br />45 <br /> <br />. <br /> <br />L.S. };'~ 19,120 <br /> <br />1,980 <br /> <br />$ 21,100 <br /> <br />$1,546,000 <br /> <br />$ 255,000 <br /> <br />$ 139,000 <br />$1,940,000 <br />