My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01986
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:02:44 PM
Creation date
10/4/2006 10:31:01 PM
Metadata
Fields
Template:
Floodplain Documents
County
Bent
Community
Las Animas
Stream Name
Arkansas River
Title
Las Animas Local Protection Project Design Memorandum
Date
8/22/1968
Prepared For
Las Animas
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~' <br />it. <br />i!'- <br />II <br />~ <br />~, <br />r <br /> <br />a. Provide, without cost to the United States, all lands, easements, <br />and rights-of-way necessary for construction of the project, including eas.e- <br />ments required for flood-zoning purposes in the ponding areas; <br /> <br />b. Hold and save the United States free from damages due to the <br />construction works; <br /> <br />c. At least annually inform individuals concerned about the residual <br />flood problem involved owing to temporary ponding; <br /> <br />d. Prevent encroachment on the river channel, which would reduce <br />the design flow capacity through the leveed section and on the ponding areas <br />and interior drains; and, if ponding area capacity is impaired, provide sub- <br />stitute storage capacity or equivalent pumping capacity promptly without cost <br />to the United States; <br /> <br />e. Make any alterations to existing improvements, other than rail- <br />road bridges and approaches in connection therewith, which may be required <br />',i because of the project; and <br /> <br />f. Maintain and operate the works after completion, including the <br />overbank clearing under and between the new highway bridge and the existing <br />railraod bridge, in accordance with regulations prescribed by the Secretary of <br />the Army. <br /> <br />2 <br /> <br />1'" <br /> <br />( <br />
The URL can be used to link to this page
Your browser does not support the video tag.