Laserfiche WebLink
<br />~' <br />it. <br />i!'- <br />II <br />~ <br />~, <br />r <br /> <br />a. Provide, without cost to the United States, all lands, easements, <br />and rights-of-way necessary for construction of the project, including eas.e- <br />ments required for flood-zoning purposes in the ponding areas; <br /> <br />b. Hold and save the United States free from damages due to the <br />construction works; <br /> <br />c. At least annually inform individuals concerned about the residual <br />flood problem involved owing to temporary ponding; <br /> <br />d. Prevent encroachment on the river channel, which would reduce <br />the design flow capacity through the leveed section and on the ponding areas <br />and interior drains; and, if ponding area capacity is impaired, provide sub- <br />stitute storage capacity or equivalent pumping capacity promptly without cost <br />to the United States; <br /> <br />e. Make any alterations to existing improvements, other than rail- <br />road bridges and approaches in connection therewith, which may be required <br />',i because of the project; and <br /> <br />f. Maintain and operate the works after completion, including the <br />overbank clearing under and between the new highway bridge and the existing <br />railraod bridge, in accordance with regulations prescribed by the Secretary of <br />the Army. <br /> <br />2 <br /> <br />1'" <br /> <br />( <br />