Laserfiche WebLink
<br /> ---- - - .-- ---- -- ----.- ------- <br />I <br />I TABLE V-I <br /> BENEI'! fiCas f fABLE <br /> CLEAR CREEK-YOIJNGFIiOL8 V-3 <br /> fHROUGH GOLDEN <br />I 1 2 3 4 5 6 7 8 9 10 II 12 13 14 15 <br /> Av~ragc <br />I so Yr. 8-1/4% 50 Yr. 8-1/ 4% Annual Average (5+7+3) (10-11) (DIU) ()+U) <br /> Annual ized Annua 1 i zed Annua I Flood Annua 1 Annua 1 Annual 5a Yr. 8-114% Benef it <br /> Design Construction Construction R-O-1oI R-O-W O&M Damage 8arnage Improvements Net Prt!sent Worth ICost ,Annua 1 <br /> Reach A I ternat ive Frequency Cost Cost Cost Cost Cost Cost Reductions Cost Benefit of Net Benefit Rat io Cost <br />I -------- -,--_._-- -- <br /> I Flood p] a 1 n <br /> Reyu I at ion 1'10 -0- -)- -0- -0- 20,350 96 ,300 -0- 20,350 -20,350 -242, (1)0 116,65a <br />I Gr as s- 1 ",ed <br /> Cnannel with <br /> Br i dye and <br />I other Selected <br /> Im~rovements 1')0 2,100,000 176,600 1,514,000 127,300 20,350 1,000 95,300 324,250 -2ed,950 -2,722,500 0.29 325,250 <br />I ROCK- 1 i nt!ll <br /> Cnanfle 1 I.~itn <br /> Bridge dnd <br /> other Selected <br />I Improvem,=nts 1,)0 5, :)50, ')00 424,700 1,176,500 98,950 17,600 1,000 95 ,300 541,250 -445,950 -5,302,,301) ,) .18 542,250 <br /> Structual-Walled <br />I Cnannt!l wi tn <br /> Bridge and <br /> otner Selt!cted <br /> Improvements 10;) 5, '~OO ,000 496,200 839,000 70,600 15,500 1,000 95,300 583,000 -488,000 -5,d02,SOO 0.16 5:34,300 <br />I Acquistion uf <br /> l. Floodplain 10) 8,687,400 730,600 see co 1 . 4 see co l. 5 20,350 15,000 81,300 750,950 -669,';5;) -1,962,800 0.11 765,950 <br /> 2. Floudway 100 4,500,000 373,450 see co 1 . 4 see col. 5 20,350 50,000 46,300 393,800 -352,500 -4,191,600 0,12 448,300 <br />I Flood~roofing <br /> wi tn Remed ia 1 <br />I Im~rovements 10:) 5:)0,000 42,OSO -0- -0- 20,350 29,000 67,300 62,400 4, ~OO 53,300 1.08 91,400 <br /> Flooa Warl1in~ <br />I System witn <br /> Floodplain <br /> Regulation lOa 120,000* 10,100 -0- -0- 32,350 96,300-** ** 42,450 -42,450 -504,800 138,750- <br />I 2 Selected <br /> :,tructura I <br /> Ill~rovements 100 35:),00f) 2~,500 -0- -0- 52,500 t t 81,100 81,700 <br />I 3 Flood P 1 a ill <br /> Reyu I at ion UO -0- -0- -0- -0- 35,000 5,000 -0- 35,000 -35,000 -416,200 40, ')00 <br /> * Tn is cost is the estimated portion of the tota I system cost applicaole to this study area. <br />I **Som~ reduction 111 f"lood damages would occur, but difficult to est imat,o. <br />t Infurmation not for public disclosure. <br />I <br />I <br /> ------- <br />