My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01851
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:58:07 PM
Creation date
10/4/2006 10:25:25 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Golden
Stream Name
Clear Creek
Title
Major Drainageway Planning
Date
9/1/1982
Prepared For
Jefferson County
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE VI-1 <br /> <br />COST S Ur~MAR y <br />FOR IMPROVEMENTS IDENTIFIED IN PHASE B REPORT ~ITHIN EACH JURISDICTION <br /> <br />JEFFERSON <br />COUNTY <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION VI <br />PHASE B MAJOR DRAINAGEWAY PLAN <br /> <br />GENERAL COMMENTS <br />The plan for Clear Creek - Youngfield through Golden was chosen by the City <br />of Golden, Jefferson County and Urban Drainage and Flood Control District <br />following review of alternative plans presented in the Phase A Report pub- <br />1 ished in February 1982. The proposed improvements described herein were <br />developed utilizing criteria contained in the Urban storm Drainage Criteria <br />Manual (Reference 18) with some modifications due to the unique characteris- <br />tics of Clear Creek. The specific criteria is described in detail in <br />Appendix B. <br /> <br />ITEM <br /> <br />CONSTRUCTION <br /> <br />Channel Improvement Costs <br /> <br />Floodproofing Costs <br />Channel Crossing Costs <br /> <br />WTP & Maple St. Berm Costs <br />Utility Relocation Costs <br /> <br />A unique aspect of this master plan is the inclusion of an interim flood <br />hazard mitigation plan under which critical areas and structures may be pro- <br />tected for a reasonable cost and within a comparatively short time frame. <br />Under the interim pl an a measure of protection can be obtained immediately <br />while funding and land purchase are sought for the long term alternative. <br /> <br />Flood Emergency Plan <br />Subtotal Construction Costs <br /> <br />Engineering and Con- <br />tingencies (30% of <br />(Construction Costs) <br /> <br />Fiscal, Legal and Admin- <br />istrative (10% of <br />Above Tota 1) <br /> <br />MAJOR DRAINAGEWAY IMPROVEMENT COSTS <br />Table VI-1 has been prepared to summarize costs and organize them in a <br />jurisdictional arrangement. The unit prices associated with the costs of <br />the Major Drainageway Pl an improvements are presented in Tables VI-2 and <br />VI-3. <br /> <br />Property Acquisition Costs <br /> <br />Total Improvement Costs <br /> <br />MAINTENANCE <br /> <br />Annual Operation/ <br />Maintenance Cost <br /> <br />VI-1 <br /> <br />CITY OF GOLDEN * <br /> <br />$ 669,700 <br />($ 115,000) <br />$ 710,000 <br />($ 3U,000) <br />($ 160,000) <br />$ 95,UOO <br />($ 25,UOO) <br />$1,474,700 <br />($ 33U,000) <br />$ 442,400 <br />($ 99,000) <br />$ 191,700 <br />($ 42,900) <br />$1,514.000 <br />$3,622,800 <br />($ 471,900 ) <br /> <br />$ 25,950 <br /> <br />$ 55,000 <br /> <br />$ 302,000 <br /> <br />$ 280,00U <br /> <br />$ 10,OOU <br /> <br />$ 20,000 <br /> <br />$ 345,000 <br /> <br />$ 322,00U <br /> <br />$ 103,500 <br /> <br />$ 96,600 <br /> <br />$ 44,900 <br /> <br />$ 41,900 <br /> <br />$ 493,350 <br /> <br />$ 460,500 <br /> <br />$ 12,000 <br /> <br />$ 73,700 <br /> <br />* Costs in parentheses in the left column represent costs for the interim <br />plan of improvements for Reach 1 described in detail in the commentaries <br />for plan and profile sheets 1 and 2, Costs indicated in the right column <br />are improvement costs within the Coors Industries area, Reach 2, Station <br />850+00 to Station 885+00. Costs within Jefferson County include improve- <br />ments at the Coors Container Building area (Station 822+00 to Station <br />829+00) and at the Coors Commodities Transload area (Station 735+00). <br />
The URL can be used to link to this page
Your browser does not support the video tag.