My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01751
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:02:48 PM
Creation date
10/4/2006 10:20:08 PM
Metadata
Fields
Template:
Floodplain Documents
County
Fremont
Community
Canon City
Stream Name
Arkansas River
Title
Canon City Community File
Date
1/1/2001
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Signing of study contract <br /> <br />October 15, 1979 <br /> <br /> <br />October 19, 1981 <br />Page two <br /> <br />Supply COM with Black/White prints of the pencil <br />manuscr ipt maps October 15, 1979 <br /> <br />1 <br />~} <br /> <br />Supply COM with pencil manuscripts and cross <br />sect ions October 15, 1979 <br /> <br />" <br /> <br />Supply COM with 1 set of line mylars <br /> <br />November 1, 1979 <br /> <br /> <br />COM to complete & publish final report <br /> <br />December 15, 1979 <br /> <br />On January 30, 1980, I wrote a letter to Ms. Dolly Duefleld, <br />Fremont County Planning Director, explaining why we missed our <br />December 15, 1979, completion date (see Attachment 1). <br /> <br />Shortly, after my January 30, 1980, letter, an agreement was <br />reached between the mapping contractor (Ponderosa Engineering), <br />the City of Canon City, and Fremont County for completing the <br />mapping as requested by this board for the floodplain study. I <br />understand that a time extension of 30 to 60 days was granted. <br /> <br />"::: <br /> <br />On May 14, 1980, Kucera & Associates, Inc., subcontractor, <br />delivered the maps and cross sections to this office and to COM. <br /> <br />On June 4, 5, and 6, 1980, we field checked the topographic <br />maps. Through this check, we found that substantial errors <br />existed throughout the mapping project. <br /> <br />On June 10, 1980, with the financial assistance of the <br />Eastern Fremont County MetropoliLan Sewage Disposal District <br />(EFCMSDO), we contracted with M&I Consulting Engineers, a <br />licensed land surveyor, to completely verify our findings. This <br />action was prompted because of the no-response attitude which we <br />received rrom Mr. Hupp. <br /> <br />On July 18, 1980, we received the results of the M&I mapping <br />checks, which showed LhdL portions or the mapping did nol m(,(,t <br />the contracted specirications. <br /> <br />On August 12, 1980, after numerous conversations with the <br />City, County, EFCMSSO, and Ponderosa Engineering officials, we <br />prepared a leter and oFricially informed Mr. Rupp of the problems <br />and provided suggestions on how to proceed to correct the maps. <br /> <br />On August 20, 1980, the City of Canon City by letter <br />instructed Mr. Rupp to correct the map errors and also restated <br />the urgency for completing the mapping and engineering studies. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.