My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01687
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01687
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:02:49 PM
Creation date
10/4/2006 10:16:50 PM
Metadata
Fields
Template:
Floodplain Documents
County
Prowers
Community
Holly
Stream Name
Arkansas River
Title
Holly Flood Control Project
Date
11/1/1981
Prepared For
Prowers County
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />, <br /> <br />The United States Army, Corps of Engineers, has made a <br />separate agreement with the Railway Company to construct a <br />portion of the project, a levee and stop-log structure, uFo" <br />the Railway Company's right-of-way. <br />The Railway Company and District agree: <br />A.RTICLE I <br />In consideration of the covenants of the District herein- <br />after containe~ and of the fai~~ful perfo~lance of the sa~c, the <br />Railway Company agrees: <br />1. To give ane grant a ?crmanent easa~ent to the District <br />to operate anu ~aintain a levee with a stc~-log str~cture <br />acros", the: "Rail",ay Corr.?any's" tr:lc;':s and during the crest of <br />extreme flcoc. staJes on \"lilci horse Creek ane. the Arkansas Ri-.,..,r <br />at !iolly, to ;;>emi t the plc.cing of said stop-log structure, <br />located at apFro:d!;tate railroao;.: Station 271+05.:) (rUle Post: 475.C). <br />2. To give an~ ~rant tile District ~~e right to acco~~lish <br />a trial erection cf ~'1;: stop-log::: annu;:4lly cr ~!henever the <br />District changes key operating personnel. Said trial erection <br />shall be under the supervision of tne District's key u?er~~ing <br />personnel, and trial erection shall be at a t~~e tilat: will not <br />interfere with the Railway Company's operation. <br /> <br />- 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.