Laserfiche WebLink
<br />1::,j!l11V!1I" i:U:U.Si!3iEF:1 & McKEE In': <br /> <br />Mr. L. Scott Tucker <br />Pebruary I, 1977 <br />Page -3- <br /> <br />of Stapleton Airport has: proc.uced c ,:onding arE,a J:)(~tween <br />the runway and Mon1:viE:w Boulevard" T::'e adjacent properties <br />are flooded l'1ith an 8-year st.orm 'even I: . <br /> <br />6. Drainage problems ~n the Ransevi0~ a7ca, located upstream <br />of the Highline Canal in the vicinitv of So. Dayton Street <br />and Wind,sor Gardens, are caused b:( t,","nped draina.qE~ a.nd <br />lack of 2Ln adequate dr'ainage outl~?t. <br /> <br />'~ecomnended Al terna ti VE, from phase 1\ <br />---. --_.~~_._---- <br /> <br />The r2commenc~ed alternat.ive plan of th..::: Phase A study Ida:; review-- <br />eel and, found to be the best solut ion r \\.'i tJ'] cl2rtain ElOd.l fica tions, <br />:oor t,~le flooc. control and drainage pr'obl"j".s for the watershed. <br />The alternative plan for the Westerly Creek flood control and <br />drain1ge improvements (AI ternati ve 3A '^,ith modi fications) <br />Bpeci fies: (1) no improvements fo:c :]):'03 ir.age Area Nos. 1 and 2, <br />(2) improvements to Pond A,-13 so that '.t '"i.11 have adeqllate <br />capacity and protection level for the IO~-'year storm event, (3) <br />const ,~uction of drainage pipes and fl:'cd dn,1,nel betw,een Pond <br />l,-.B a:1d Lowry Air Force Bas," to p rovi ,'k dra:',nage outlet for <br />1:he upper watershed, (4) construc t.ion c ,[ ,,:he Dayton Dei:ention <br />Pond t.O detain storm water from part, () f ':J:'ainage ]\,rea Nos" 3 <br />and 4, (5) construction of drainaqe fdciJ.:lties in the Hang",view <br />area 'to solve local drainage prob lem!3, (,,:: construction of the <br />Upper Lowry Detention Pond to sto ce '3::crm wa.ter from upstream <br />of thl" pond and to relieve floodinq problem:; at :Kelly Poad Dam <br />to provide an adequate protection :Lev",:!, (ja contain the 100- <br />,'ear !3torm without emergency spillway OVE:J:flow and to pass the <br />PMF safely), (8) construction of a fl(~d channel along E. <br />i.lameda Avenue to convey storm water f,-om the upstream area, <br />including Windsor Gardens, 1:0 the UPIX!r Lowry Detention Pond, <br />(9) channel and cuI vert improvements (10'''yea:c design) from Kelly <br />Hoad Dam to Stapleton Airport, to reduce the flooding poten1:ial <br />in this area, (10) flood proofing Stanley Aviation Corporat,ion <br />to reduce flood damages, and (11) no j.mprovements across <br />,:tapl,\ton Airport and downs1:ream of Si::ap1"ton Airport.. <br /> <br />1!t,<3ster Plan Drawinqs <br /> <br />Naster Plan Drawinqs were prepan,d on mylar plan and profile <br />sheets at a horizontal scale of 1" = ~OO' and a vertical scale <br />of 1" = 10' (with some exceptions as J:.oted on the dra\olings) . <br />The drawings are presented i.n Volume :i:: a,t a reduced scale.. <br />For the area downs1:ream of Kelly Road Dam, informati.on shown <br />on the drawings includes (1) t.ypical channel and box culvert <br />cross-section, (2) right-of-way requirements, (3) flood bound- <br />aries for the 10-year and lOll-yea::' S1:C1:11S under existing channe1 <br />