Laserfiche WebLink
<br />1l::,A.MJ."ll DI::tEIEU:1ER It. McKEE Ine. <br /> <br />1V!r. L. Scott Tucker <br />February 1, 1977 <br />Page --4- <br /> <br />conditions and improved channl~l conditions with fut:ure basin <br />development, (4) existinq ut:Ui ties a.no. drainage facilities, <br />(5) adjacent bank elevations after improvements, (6) water <br />surface profiles for the 10-year and lOO-year storm events <br />after improvements. <br /> <br />For the area upstream of KeLly Road Dam, informat:ion shown on <br />the drawings includes: (1) 1:ypical channel a.nd embankment <br />cross-sections, (2) right-of--way requLCf,EI1:,ntE:, (3) location <br />and profile of the proposed improvement C3" and (4) exis1:inq <br />utilities and drainage facilities. <br /> <br />l~~12rovement Costs <br /> <br />I\ deta iled cost estimate of the irnprovE,men Ls for the sE,lected <br />alternative plan was prepared from th" master plan drawinqs. <br />1'he co sts are lis.ted in Appendix A for "ach individual seqment. <br />The total capital cost of these improvemenLs is estimated to be <br />;;13,190,400. <br /> <br />C8nstruction Program <br /> <br />1'he entire drainage and flood control improvement,s for Westerly <br />Creek were divided into t:hree construction stages depending on <br />the priority of the improvements. The estimated capital expendi- <br />ture for Stage lA construction is $4,883,100, which includes: <br />(1) land acquisition, (2) Pond A-I', outlet works modification, <br />(3) drainage pipe and flood channel fron Pond ,A.-B to the Upper <br />Lowry Detention Pond, (4) Upper- Lowry Det.ention Pond, and <br />(5) Kelly Pond Dam impr()vement:~;. <br /> <br />'['he estimated capital expendi t:llre for St:a.qe IB construction is <br />$5,670,500, which includes: (1) ~iestE~rJ.y Creek Channel Improve- <br />m'~nts below Kelly Road Dam, and (2) flood proofing Stanley Avia- <br />tion C8rporation. <br /> <br />'['he estimated capital expendit:tlre for Staqe 2 construct.ion is <br />$:371,900, which includes: (1) Pond A..B improvement:s, (2) street <br />c:cossings along East Alameda Avenue, al1C' (:J) flood channel alonq <br />East Alameda Avenue. <br /> <br />'['he estimated capital expendi t.ure for :3taqe 3 const:ruction is <br />$1,814,900, which includes: (1) Dayt:ol1 D'e1:ention Pond, (2) Ken- <br />tucky Drive drainage system, (3) Dayton Street drainaqe system, <br />(4) dr'iinage system for t.hE' northwest: paxt: of Drainage Area No.3, <br />and (5) draina,ge sys.tem along' sout.h side 0" East Alameda Avenue. <br />