Laserfiche WebLink
<br />I <br /> V-7 <br />I TABLE V-4 <br /> COST BY REACH <br />I ($1,OOO's) <br /> Drai nage Street Ut i1 ity Total Right-of-Way Total Annual <br /> Improvement Crossing Relocation Construction Acquisition Improvement O&M <br />I Reach Costs Costs Costs Costs Contingency Costs Cost s Cost s <br />R1 Cl ear Creek <br />I to Pi erce St. 2,739.8 876.6 63.3 3,679.7 1,103.9 3,098.4 7,882.0 34.5 <br />R2 Pierce Street <br /> to Van Bibber Cr. 1,042.1 646.9 38.4 1,727.4 518.2 1,040.0 3,285.6 16.8 <br />I R3 Van Bibber Creek <br /> to Leyden Creek 6,336.2 1,223.6 178.0 7,737.8 2,321.3 1,010.1 ll,069.2 25:3 <br />I L1 Ralston Creek to <br />City Limit 236.1 174.4 18.0 428.5 128.6 186.6 743.7 16.4 <br />I L2 City Limit to <br />Alkire Street 0 128.7 1.0 129.7 38.9 0 168.6 42.6 <br />I L3 Alkire Steret to <br />Leyden Lake 2,139.8 12.8 0 2,152.6 646.2 22.5 2,821.3 15.3 <br />I V1 Ralston Creek to <br />Kipling Street 2,069.4 194.4 4.8 2,268.6 680.6 305.6 3,254.8 8.2 <br />I V2 Kipling Street to <br />Oak St reet 87.4 617.3 0 704.7 211. 4 0 916.1 4.4 <br /> V3 Oak Street to <br />I Ward Road 733.0 0 0 733.0 219.9 2,122.0 3,074.9 7.8 <br /> V4 Ward Road to <br />I Indi ana Street 54.9 36.0 0 90.9 27.3 52.4 170.6 16.4 <br />I TOTAL 15,438.7 3,910.7 303.5 19,652.9 5,896.3 7,837.6 33,386.8 187.7 <br />I TABLE V-5 <br /> COST BY JURISDICATION <br /> ($l,OOO's) <br />I <br /> Drainage Street Uti 1 ity Total Right-of-Way Total Annual <br />I Improvement Crossing Re 1 ocat ion Construction Acqui sit ion Improvement O&M <br />Reach Costs Costs Cost s Costs Cont i ngency Costs Costs Costs <br />I Jefferson Cty. 3,448.0 1,095.8 1.0 4,544.8 1,363.4 4,506.9 10,415.1 91.8 <br />City of Arvada ll,990.7 2,814.9 302.5 15,108.1 4,532.9 3,330.7 22,971. 7 95.9 <br />I TOTAL 15,438.7 3,910.7 303.5 19,652.9 5,896.3 7,837.6 33,386.8 187.7 <br />