<br />I
<br /> V-7
<br />I TABLE V-4
<br /> COST BY REACH
<br />I ($1,OOO's)
<br /> Drai nage Street Ut i1 ity Total Right-of-Way Total Annual
<br /> Improvement Crossing Relocation Construction Acquisition Improvement O&M
<br />I Reach Costs Costs Costs Costs Contingency Costs Cost s Cost s
<br />R1 Cl ear Creek
<br />I to Pi erce St. 2,739.8 876.6 63.3 3,679.7 1,103.9 3,098.4 7,882.0 34.5
<br />R2 Pierce Street
<br /> to Van Bibber Cr. 1,042.1 646.9 38.4 1,727.4 518.2 1,040.0 3,285.6 16.8
<br />I R3 Van Bibber Creek
<br /> to Leyden Creek 6,336.2 1,223.6 178.0 7,737.8 2,321.3 1,010.1 ll,069.2 25:3
<br />I L1 Ralston Creek to
<br />City Limit 236.1 174.4 18.0 428.5 128.6 186.6 743.7 16.4
<br />I L2 City Limit to
<br />Alkire Street 0 128.7 1.0 129.7 38.9 0 168.6 42.6
<br />I L3 Alkire Steret to
<br />Leyden Lake 2,139.8 12.8 0 2,152.6 646.2 22.5 2,821.3 15.3
<br />I V1 Ralston Creek to
<br />Kipling Street 2,069.4 194.4 4.8 2,268.6 680.6 305.6 3,254.8 8.2
<br />I V2 Kipling Street to
<br />Oak St reet 87.4 617.3 0 704.7 211. 4 0 916.1 4.4
<br /> V3 Oak Street to
<br />I Ward Road 733.0 0 0 733.0 219.9 2,122.0 3,074.9 7.8
<br /> V4 Ward Road to
<br />I Indi ana Street 54.9 36.0 0 90.9 27.3 52.4 170.6 16.4
<br />I TOTAL 15,438.7 3,910.7 303.5 19,652.9 5,896.3 7,837.6 33,386.8 187.7
<br />I TABLE V-5
<br /> COST BY JURISDICATION
<br /> ($l,OOO's)
<br />I
<br /> Drainage Street Uti 1 ity Total Right-of-Way Total Annual
<br />I Improvement Crossing Re 1 ocat ion Construction Acqui sit ion Improvement O&M
<br />Reach Costs Costs Cost s Costs Cont i ngency Costs Costs Costs
<br />I Jefferson Cty. 3,448.0 1,095.8 1.0 4,544.8 1,363.4 4,506.9 10,415.1 91.8
<br />City of Arvada ll,990.7 2,814.9 302.5 15,108.1 4,532.9 3,330.7 22,971. 7 95.9
<br />I TOTAL 15,438.7 3,910.7 303.5 19,652.9 5,896.3 7,837.6 33,386.8 187.7