My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01390
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01390
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 10:40:01 AM
Creation date
10/4/2006 9:59:18 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Title
Standard Operating Procedures Manual for Interagency Hazard Mitigation Teams
Date
3/1/1984
Prepared For
US
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />0, Coordinate with the Public Information Officer (PIa). <br /> <br />It is necessary to coordinate with the Public Information <br />staff to discuss methods for promoting an awareness of <br />hazard mitigation and the Team process and to assess the <br />pol itical and social economic climate in which the Team <br />will be operating (Attachment #11). Early contact with <br />the media is an essential part of this activity, <br /> <br />p, Begin and maintain a chronology of events, <br /> <br />This provides documentation of Team activities and can <br /> <br /> <br />become part of the Report (Attachment #12). <br /> <br />, <br /> <br />Q, Activate the Team, <br /> <br />This is one of the final steps in the Pre-Declaration <br />Activities or one of the first Immediate On-Site <br />Activities, By this time all Team members should have <br />been briefed, should be fully aware of the situation as <br />it has developed, and be anticipating a telephone call <br />for activation (Attachment #13), As the respective <br />agencies' Team members must fund their travel and living <br />expenses, an effective use of the Team's time at the <br />disaster site is required. Effective planning and <br />scheduling of meetings and other activities will assure <br />,I that the Team will generally be activated for two to <br />
The URL can be used to link to this page
Your browser does not support the video tag.