Laserfiche WebLink
<br />~ <br /> <br />three days only, <br /> <br />R. Prepare the Team activation letters, <br /> <br />The letter should advise Team members of the reason(s) <br /> <br /> <br />for activation; the date, time, and place of the initial <br /> <br /> <br />Team briefing; and relevant schedules (Attachment #14). <br /> <br />S, Team deactivation, <br /> <br />It is required that any Presidential Disaster Declaration <br />for flooding result in the activation of a Regional <br />Interagency Hazard Mitigation Team. The Team, however, <br />. can be deactivated immediately or at any time thereafter <br />if it has been determined that there are insufficient <br />hazard mitigation opportunities to justify a Team <br />activation (Attachment #15), <br /> <br />.1 <br /> <br />Ii <br />