Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />5.2.11 Tri-Town Basin Reach Tl: WCR 24 <br /> <br />The improvements in the Tri-Town Basin begin in Reach Tl and are focused on: (aY the <br />transition of flows from the major drainageway into the improvements associated with the Godding <br />Hollow Basin; (b) channel improvements upstream and downstream of WCR 24; and (c) <br />installation of a crossing structure beneath WCR 24. The specific improvements to Reach Tl are <br />presented below and also in Figure S .12. <br /> <br />I. Transition to Godding Hollow Drainageway In the vicinity of the northern lake <br />associated with The Shores Development, the major drainageway for the Tri- Town <br />Basin will transition from an improved channel into the lake. Stabilization <br />measures will be required at this location. <br /> <br />2. Channel Improvements This improvement consists of the construction associated <br />with a conveyance channel from the transition into the lake to a proposed regional <br />pond located downstream of WCR 22. Approximately 7.600 feet of channel <br />improvements will be required. The channel improvements should include a <br />compound channel configuration, i.e., a low flow channel along with an overbank <br />area to convey flood flows. In addition, the channel incorporates a grass lining, <br />bottom width of 20 feet (low flow channel), maximum top width of 90 feet, <br />sideslopes of 4H: 1 V, and design depth that varies from 4 to 6 feet. At the <br />upstream end of the channel improvements, a transition structure is required to <br />stabilize the outflow from the proposed regional pond. <br /> <br />3. WCR 24 Crossing Structure In conjunction with the conveyance channel, a <br />crossing of WCR 24 will be required. This crossing will consist of a structure with <br />a minimum opening that is 4'H x SO'W. A drop structure is also required in the <br />vicinity of this crossing to ensure that stormwater runoff will be conveyed beneath <br />WCR 24. <br /> <br />5.2.12 Tri-Town Basin Reach T2: WCR 22 <br /> <br />The improvements in Reach T2 are focused on: (a) construction of two regional detention <br />ponds; and (b) replacement of an existing crossing of WCR 22. The specific improvements to <br />Reach T2 are presented below and also in Figure S .13. <br /> <br />I. Regional Detention Ponds To reduce the peak flows within the major <br />drainageway, two regional detention ponds are proposed north and south of WCR <br />22. For the pond located north of WCR 22, 10S acre-feet of storage is required <br />which will necessitate the acquisition of approximately 38 acres along with the <br /> <br />T:IOPEMCoweldO/\CQweldOJ Inl rpt.wpd <br /> <br />5.26 <br /> <br />September 8, 1999 <br />