My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01374
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:58:18 PM
Creation date
10/4/2006 9:58:29 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
521
County
Weld
Community
Erie, Firestone, Dacono
Stream Name
Tri-town drainageway, Godding Hollow Basin
Title
South Weld I-25 Corridor Master Drainage Plan
Date
9/8/1999
Prepared For
Weld County
Prepared By
Anderson Consulting Engineers, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I I <br />I <br /> <br />1. WCR 10 Crossing Replace the existing 2'H x 3.5'W arch CMP crossing ofWCR <br />10 with a structure with a minimum opening of 3 'H x 5' W. Transitions from the <br />existing channel to the bridge crossing are required along with placement of <br />stabilization measures to control the potential erosion in the vicinity of the crossing. <br />In conjunction with replacement of the crossing structure, approximately 250 feet <br />of roadway should be raised a maximum of 1.5 feet. <br /> <br />2. Regional Detention Ponds To reduce the peak flows within the major <br />drainageway, two regional detention ponds are proposed south of WCR 10 and <br />west of I-25. Both ponds are located behind an existing railroad embankment. <br />For the pond located along the major drainageway, 22 acre-feet of storage is <br />required which will necessitate the acquisition of approximately IO acres along with <br />the construction of an improved outlet structure. The pond located on the tributary <br />to the major drainageway will require 33 acre-feet of storage. At this location, it <br />is necessary to obtain approximately 5 acres of land along with the construction of <br />an improved outlet. <br /> <br />This reach also includes the crossing of I-25 and the East Frontage Road. Conversations <br />with representatives of CDOT have indicated that these structures will be replaced with two 8 'H <br />x 8'W RCBs. It should be noted that the existing structures adequately convey the peak flows <br />generated during the 100-year storm event. The proposed structures also convey these flows. <br /> <br />5.2.10 Godding Hollow Basin Reach GIO: West Tributary at 1-25 <br /> <br />The improvements in this reach focus on the alleviation of flooding at I-25 and a tributary <br />to the major drainageway located north of State Highway 52. Based on conversations with <br />representatives ofCDOT, the existing 36-inch structure is being replaced with three 6'H x 8'W <br />RCBs. In addition, a conveyance channel is being constructed to convey stormwater runoff from <br />the 1-25 crossing to the major drainageway. However, it is understood that the existing detention <br />pond at this location (approximately 80 acre-feet) is being reduced significantly. To limit the peak <br />flows in the major drainageway and mitigate the reduction of the existing detention pond, a <br />regional detention facility is proposed immediately east of I-25 along the tributary channel. The <br />regional pond will store 144 acre-feet which will require acquisition of 40 acres of land along with <br />the construction of an outlet structure. The improvements to Reach G 10 are presented in Figure <br />5.11. <br /> <br />T:10PEMCoweldO/lcoweldO/ I'll rpt.wpd <br /> <br />5.25 <br /> <br />September 8, /999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.