Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />,I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br />I <br />, I <br />I. <br /> <br />construction of an improved outlet structure. Construction of this pond will also <br />require the relocation of an existing irrigation lateral. <br /> <br />The pond located south of WCR 22 will require the acquisition of 28 acres of land <br />which will provide 139 acre-feet of detention storage. An outlet structure will also <br />be required. <br /> <br />2. WCR 22 Crossing Replace the existing 3'H x 5'W arch CMP crossing of WCR <br />22 with a structure with a minimum opening of 6.5'H x 30'W. Transitions from <br />the existing channel to the bridge crossing are required along with placement of <br />stabilization measures to control the potential erosion in the vicinity of the crossing. <br />In conjunction with replacement of the crossing structure, approximately 500 feet <br />of roadway should be raised a maximum of 2 feet. <br /> <br />5.2.13 Tri-Town Basin Reach T3: WCR 20/WCR III <br /> <br />The improvements in Reach T3 are focused on: (a) replacement of existing crossings at <br />WCR 20 and WCR 18; (b) construction of channel improvements near Milavec Reservoir; and (c) <br />construction of a regional detention pond. The specific improvements to Reach T3 are presented <br />below and also in Figure 5.14. <br /> <br />1. WCR 20 Crossing. Replace the existing 2.5'H x 3.5'W arch CMP crossing of <br />WCR 20 with a structure that incorporates a minimum opening that is 5'H x 50'W. <br />Transitions from the existing channel to the bridge crossing are required along with <br />placement of stabilization measures to control the potential erosion in the vicinity <br />of the crossing. In conjunction with replacement of the crossing structure, <br />approximately 720 feet of roadway should be raised a maximum of 3 feet. <br /> <br />2. Channel Improvements This improvement consists of the construction associated <br />with a conveyance channel along the east side of Milavec Reservoir and extending <br />through the crossings of WCR 18 and WCR 13. Approximately 2,800 feet of <br />channel improvements will be required. The channel improvements should include <br />a compound channel configuration, i.e., a low flow channel along with an overbank <br />area to convey flood flows. In addition, the channel incorporates a grass lining, <br />bottom width of 20 feet (low flow channel), maximum top width of 90 feet, <br />sideslopes of 4H:IV, and design depth of 4 feet. It should be noted that the Town <br />of Frederick is proposing to replace an existing access road crossing to Milavec <br />Reservoir which will cross the channel improvements. <br /> <br />3. WCR ]8 Crossing Replace the existing 17.5-foot bridge structure at WCR 18 <br />with a structure that incorporates a minimum opening that is 5.5'H x 30'W. <br />Transitions from the existing channel to the bridge crossing are required along with <br /> <br />T:IOPEMCoweldO/\coweldOJ Inl rpt.wpd <br /> <br />5.27 <br /> <br />September 8, J 999 <br />