Laserfiche WebLink
<br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />5.2.3 Godding Hollow Basin Reach G3: WCR 24 to Godding Ditch <br /> <br />Improvements in Reach G3 focused on the alleviation qf flooding problems at three <br />locations: (a) WCR 24; (b) the channel reach upstream of WCR 24; and (c) WCR 22. The specific <br />improvements to Reach G3 are presented below and also in Figure 5.4. <br /> <br />1. WCR 24 Crossing. Replace the existing 6'H x 8'W arch CMP crossing of WCR <br />24 with a bridge structure with a minimum opening of 12'H x 58'W. Transitions <br />from the existing channel to the bridge crossing are required along with placement <br />of stabilization measures to control the potential erosion in the vicinity of the <br />crossmg. <br /> <br />2. Channel Improvements. In conjunction with the improvements to the crossing at <br />WCR 24, construct approximately 3,000 feet of channel improvements upstream <br />from WCR 24. The channel improvements should incorporate a compound channel <br />configuration, i.e., a low flow channel along with an overbank area to convey flood <br />flows. In addition, the channel incorporates a grass lining, bottom width of 20 feet <br />(low flow channel), maximum top width of 400 feet, sideslopes of 4H:IV, and <br />design depth of 4 feet. At the upstream end of the channel improvements, a berm <br />is required to capture the stormwater runoff and direct the flows into the proposed <br />improvements. <br /> <br />3. WCR 22 Crossing Replace the existing 6'H x 7.5'W arch CMP crossing ofWCR <br />22 with a bridge structure with a minimum opening of 6.5'H x 80'W. Transitions <br />from the existing channel to the bridge crossing are required along with placement <br />of stabilization measures to control the potential erosion in the vicinity of the <br />crossing. <br /> <br />5.2.4 Godding Hollow Basin Reach G4: WCR 20 <br /> <br />The proposed improvements to Reach G4 focus on the replacement of the existing 6'H x <br />8'W arch CMP crossing ofWCR 20 with a bridge structure with a minimum opening of 4.5'H x <br />135'W. Transitions from the existing channel to the bridge crossing are required along with <br />placement of stabilization measures to control the potential erosion in the vicinity of the crossing. <br />In conjunction with the replacement of the existing structure, approximately 850 feet of the <br />roadway should be raised to a maximum height of I foot. Figure 5.5 presents the improvements <br />for Reach G4. <br /> <br />T:IOPEMCoweIdOJlcoweldO/ Inl rpt.wpd <br /> <br />5.22 <br /> <br />September 8, 1999 <br />