My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01374
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:58:18 PM
Creation date
10/4/2006 9:58:29 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
521
County
Weld
Community
Erie, Firestone, Dacono
Stream Name
Tri-town drainageway, Godding Hollow Basin
Title
South Weld I-25 Corridor Master Drainage Plan
Date
9/8/1999
Prepared For
Weld County
Prepared By
Anderson Consulting Engineers, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />il <br />I <br />I <br /> <br />5.2.1 Godding Hollow Basin Reach Gl: Saint Vrain River to"The Shores" Lakes <br />Outlet <br /> <br />The proposed improvements to Reach Gl are presented below and presented in Figure 5.2. <br /> <br />1. Channel Improvements. Construct approximately 3,000 feet of channel <br />improvements from the confluence of the Saint Vrain River to the outlet from "The <br />Shores" Lake. The channel improvements should include a low flow channel along <br />with an overbank area to convey flood flows. In addition, the channel <br />incorporates a grass lining, bottom width of 20 feet (low flow channel), maximum <br />top width of 400 feet, sideslopes of 4H:IV, and design depth of approximately 4 <br />feet. In conjunction with construction of the channel, a transition structure into the <br />Saint Vrain River and from the lake is required. <br /> <br />2. WCR 26 Crossing Replace the existing 3'H x S.5'W RCB crossing ofWCR 26 <br />with a bridge structure with a minimum opening of 6'H x l00'W. Transitions from <br />the channel improvements to the bridge crossing are required along with placement <br />of stabilization measures to control the potential erosion in the vicinity of the <br />crossing. <br /> <br />3. Realign Last Chance Ditch. Construction of the channel and bridge crossing will <br />require realignment of the Last Chance Ditch to a location adjacent to WCR 26. <br />An inverted siphon (approximately 150 feet) is required to convey flows beneath <br />the major drainageway. In conjunction with the realignment of the ditch, a side- <br />channel weir should be included in the improvements to divert potential stormwater <br />captured by the ditch into the major drainageway. <br /> <br />5.2.2 Godding Hollow Basin Reach G2: Outlet of "The Shores" Lakes to WCR 24 <br /> <br />The proposed improvements to Reach G2 focus on the transition structure between the two <br />lakes. The transition structure includes the placement of stabilization measures to ensure the <br />conveyance of stormwater runoff in an erosionally stable manner. Based on a review of proposed <br />development plans, it has been assumed that a portion of the Rural Ditch will be realigned during <br />the construction of the lakes. This realignment will be completed in conjunction with development <br />of the property. Figure 5.3 presents the improvements in Reach G2. <br /> <br />T:IOPEMCoweldOl\coweldO} fnl rpt. wpd <br /> <br />5.21 <br /> <br />Septemb;r 8, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.