Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br /> <br />5.2.5 Godding Hollow Basin Reach G5: WCR 18 <br /> <br />The proposed improvements to Reach G5 focus on the replacement of the existing 6'H x <br />8'W arch CMP crossing ofWCR 18 with a bridge structure with a minimum opening of 6.5'H x <br />90'W. Transitions from the existing channel to the bridge crossing are required along with <br />placement of stabilization measures to control the potential erosion in the vicinity of the crossing. <br />An existing detention pond is also located within this reach. The existing pond is located <br />west of 1-25 and south of WCR 18. This existing pond tends to reduce the peak flows within the <br />major drainageway; consequently, preserving the storage volume is necessary. At this location, <br />it is recommended that property be obtained and a new detention pond be constructed capable of <br />storing not less than 88 acre-feet. <br />Figure 5.6 presents the improvements associated with Reach G5. <br /> <br />5.2.6 Godding Hollow Basin Reach G6: WCR 16 <br /> <br />The proposed improvements to Reach G6 focus on the replacement of the existing 6' H x <br />8'W arch CMP crossing of WCR 16 with a bridge structure with a minimum opening of 8'H x <br />40'W. Transitions from the existing channel to the bridge crossing are required along with <br />placement of stabilization measures to control the potential erosion in the vicinity of the crossing. <br />In conjunction with the replacement of the existing structure, approximately 800 feet of the <br />roadway should be raised to a maximum height of 5 feet. Figure 5.7 presents the improvements <br />associated with Reach G6. <br /> <br />5.2.7 Godding Hollow Basin Reach G7: State Highwa.y 52fCoalridge Ditch <br /> <br />Improvements in Reach G7 focused on the alleviation of flooding problems in the vicinity <br />of State Highway 52. The specific improvements to Reach G7 are presented below and also in <br />Figure 5.8. <br /> <br />1. State Highway 52 Crossing Replace the existing 8'H x 8'W RCB crossing of State <br />Highway 52 with a bridge structure with a minimum opening of 10'H x 11 'W. <br />Transitions from the existing channel to the bridge crossing are required along with <br />placement of stabilization measures to control the potential erosion in the vicinity <br />of the crossing. In conjunction with the bridge replacement, raise 1,600 feet of <br />roadway a maximum of 4 feet. <br /> <br />T:IOPEMCoweldO/lcoweidOJ Inl rpt.wpd <br /> <br />5.23 <br /> <br />SeptemberS, 1999 <br />