My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01265
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:58:20 PM
Creation date
10/4/2006 9:53:35 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Title
Colorado River Storage Project and Participating Projects for Fiscal Year 1973
Date
1/1/1973
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />" <br />.. <br />.. <br />} <br /> <br />~ <br /> <br />. <br /> <br />, <br />; <br /> <br />, <br />, <br /> <br />.r" <br />-------.i <br />" <br />L <br /> <br /> <br />............-~-', <br /> <br />- <br /> <br />.~,. <br />,. t!_. <br /> <br /> <br />'" <br /> <br />~ <br />. <br /> <br />- <br />'oL~' ,..''1. <br />~:i ~~~~. \. <br />,-- . .--"':"~', <br /> <br />,.4 <br /> <br />Highway relocations were completed 10 <br />bypass the enlarged Strawberry Reser- <br />voir. Bonneville Unit. The highway <br />around Fontenelle Reservoir, Seedska- <br />dee Project, was rehabilitated. <br /> <br />Administration 01 recreation facilities on <br />Fontanelle Reservoir was assumed by <br />the BUfeau of Reclamation in May 1973. <br /> <br />Siphon replacements on the Gould <br />Canal 01 the Fruitland Mesa Project <br />were completed. <br />Exploratory drilling of the Nambe Falls <br />Damsite (San Juan-Chama Project) was <br />completed and a contract was awarded <br />lot the access road, <br /> <br />Additions 10 the Waler Filtration Plant <br />for the lown of Page were completed <br />on the Glen Canyon Unit, <br />At Lemon Dam (Florida ProJect) ex. <br />tr~mely cold weather damaged con- <br />crete spillway walls and the stilling <br />basin. Emergency fepairs will be under- <br />taken in Fiscal Year 1974. <br /> <br />Construction started on the Archer- <br />Weld 230-kv Transmission Line, Stage <br />02 of the Weld Substation, and Stage <br />02 of the Midway Substation. The loca- <br />tion study was completed for the CUre- <br />canti-Shiprock Transmission Line No.2. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.