Laserfiche WebLink
<br />1973 FISCAL YEAR HIGHLIGHTS <br /> <br />Construction continued on the Crystal <br />Dam of the Curecanti Unit and the Crys- <br />lal Diversion Tunnel was completed. <br /> <br />A "mote" drilled Ihfough Currant and <br />Layout Tunnels, Bonneville Unit. On <br />the Navajo Indian Irrigation ProJect, <br />moling was completed on Tunnels 3 <br />and 3A and was started on Tunnel <br />No, 4. <br />Navajo Reservoir water storage reach- <br />ed an all time high and ~ega!lleilljns <br />for the first time on June 25, 1973. -- <br />The first portion of the Jordan Aqu~ <br />ductal the Bonneville Unit. Central'fltah-- <br />Project. in Salt Lake County was s;tb- <br />stanlially completed. I ~ <br /> <br />2 <br /> <br />~ <br />1- <br /> <br />~ <br />I <br />I <br /> <br />- <br /> <br />I <br /> <br /> <br />~/ <br />I <br /> <br />1!2:a';'J. <br /> <br />J <br /> <br /> <br />I <br /> <br />I <br />