Laserfiche WebLink
<br />!tem <br /> <br />so. <br /> <br />Third Ave. <br />1 <br /> <br />Glenora <br /> <br />Street <br />1 <br /> <br />S~gilr <br /> <br />Factory <br />1 <br /> <br />TABLE 18 (Contd.) <br /> <br />Description <br /> <br />Quantity <br /> <br />Service Area No.1 Cont. <br /> <br />36"RCP <br />Dewatering <br />Asphillt Rep1ace~ent <br />loIanho1es <br /> <br />686LF <br /> <br />36"RCP <br />Dewatering <br />As~halt Replace~~nt <br />Manholes <br /> <br />1,S08LF <br /> <br />Unit <br />Cost <br /> <br />$36/LF <br />S12lLF <br />SlJ/LF <br />S 4/LF <br /> <br />$36/LF <br />S12/LF <br />SlJ/LF <br />S 4/LF <br /> <br />Total Construction Cost <br /> <br />Engineering and Contingencies <br />(2U per~ent of construction costs) <br />Legal, Fiscal. and ~drninistration <br />C5 percent o~ construction. engineering, <br />contingencies) <br /> <br />TOTAL COST <br /> <br />Service AreJ No.2 <br /> <br />Drainaoe Ditch <br />SterilngNO.2Ditch <br />~ Improvements <br /> <br />Crossing <br /> <br />Engineering and Continencies <br />(30 percent of construction costs) <br />Legal. Ad",inis~rative, and Fiscal <br /> <br />~(;T:\:" :~S7 <br /> <br />1:0 <br /> <br />L.S. <br /> <br />Total <br />Cost <br /> <br /> <br />S 24,~96.00 <br />8,232.00 <br />8.918.00 <br />2,744.00 <br /> <br />54,288.00 <br />18,096.00 <br />19,604.00 <br />6,032.00 <br />51,285,136.00 <br /> <br />257,027.00 <br /> <br />S 30,000.00 <br /> <br />9.000.00 <br />1.950.00 <br /> <br />~ ~O,95C' .00 <br /> <br />A,h <br /> <br />So. <br /> <br />TABLE 18 (Contd.) <br /> <br />Item <br /> <br />Description <br /> <br />Quantity <br /> <br />Street <br />1 <br /> <br />Service Area No. 3 <br /> <br />731LF <br /> <br />30"RCP <br />Dewatering <br />Asphalt Replacement <br />Manholes <br /> <br />2 48"RCP <br />Dewatering <br />Asphalt Replac~ent <br />Manholes <br /> <br />Second Street <br />1 48' RCP <br />Dewateri~g <br />Asphalt R~p1acement <br />Manholes <br /> <br />48' RCP <br />Dewatering <br />Asphalt Replacement <br />Manholes <br /> <br />48'RCP <br />Dewatering <br />Asphalt Replac~ment <br />Manholes <br /> <br />343LF <br /> <br />503LF <br /> <br />343LF <br /> <br />350LF <br /> <br />lInit <br />Cost <br /> <br />$30/LF <br />512/LF <br />S13/LF <br />S4/LF <br />S48/LF <br />S12/LF <br />S13/LF <br />$4/LF <br /> <br />S48/LF <br />S12/LF <br />S13/LF <br />S 4/U' <br /> <br />548/LF <br />S12/LF <br />S13/LF <br />54/LF <br /> <br />S48/LF <br />$l21LF <br />S13!LF <br />S4/LF <br /> <br />Total Construction Cost <br /> <br />Engineering and Conting~ncies <br />Legal, nscal, and Administrative <br /> <br />TOTAL COST <br /> <br />111 <br /> <br />Total <br />Cost <br /> <br /> <br />521,930.00 <br /> 8,772.00 <br /> 9,503.00 <br /> 2,924.00 <br />, 16,464.00 <br /> 4,116.00 <br /> 4,459.00 <br /> 1,372.00 <br /> 24,144.00 <br /> 6,036.00 <br /> 6.539.00 <br /> 2,012.00 <br />, 16,464.00 <br /> 4,116.00 <br /> 4,459.00 <br /> 1,372.00 <br />S 16,800.00 <br /> 4,200.00 <br /> 4,5S0.00 <br /> 1,400.00 <br />5161,632.00 <br /> 32,326.00 <br /> 9,698.00 <br />5203.656.00 <br />