Laserfiche WebLink
<br /> <br /> <br />TA3LE18 (Ccntd.) <br /> <br />Til8lEI8(Contd.) <br /> <br /> Ur.it Total Item Description Quantity Unit Total <br /> Item Description Quantity Cost Cost Cost Cost <br /> Service Area No.8 Cont. <br /> Service Area No. 4 Franklin St. (South) <br />8roadwavSt. $81/lF 5445,500.00 1 JJ"RCP 1,450 IF $33!lF S47,850.00 <br /> 5.:00lF Dewatering 512!lF 17,400.00 <br /> 1 54"RC? S15!lF 82.500.00 Asphalt Replacement S13!lF 18,850.00 <br /> Dewatering 2,700lF SlJ/lF 35,100.00 Manholes S4/lF 5,800.00 <br /> Asphalt Replace:;o.ent 5,500LF S ~/lF 22.000.00 <br /> Manholes 2 42"RCP 1.2DOlF $42/lF 50,400.00 <br /> Highway 138 & RR Crossing 350LF S175/lF 51,250.00 Dewatering SJ2/lF 14,400,00 <br /> 2 Asphalt Replacement $13/lF 15.600.00 <br /> Easement! Service Road 2,700lF L.S. 18.560.00 Manholes $4/lF 4,800.00 <br /> 3 <br /> 1 L.S. S.OOO.DO Frar.klinSt. (North) <br /> 4 Headwall 1 24" RCP 1.2S0LF S24/LF 30.000.00 <br /> Total Construction Cost S669.910.00 Dewatering SI2/LF 15,000.00 <br /> 133,ge2.00 As;;ha1tRep1acer.ll!nt SlJ/lF 16,250.00 <br /> Engineering and Contingencies 1'!anholeS S4/Lr 5,00.00 <br /> and Adm;n1stration dO.195.00 2 42"RCP l,500LF S42/LF 53.000.00 <br /> le<;al,flscal, De'IO'aterfng Sl2/LF 18,000.00 <br /> TOTALC05T 5844.087.00 Asphalt Re~lacement 513/LF 19.500.00 <br /> I- Manholes S ~/lF 6.000.00 <br /> Elm St. <br /> I. <br /> ServiCe Area ~o. 8 1 24"RCP 1.500LF $24/lF 36,000.00 <br /> Dewatering SlULF 18.000.00 <br />NO. Division Ave. 3SOlF S35/lF \ 12,600.00 Asphalt Replacement S13!lF 19,500.00 <br /> 1 36"RCP S12fLF 4,200.00 II Manholes S4/LF 6,000.00 <br /> Dewatering $13/lF 4,550.00 <br /> Asphalt Replacement S4!LF 1.400.00 i PaloneeAvellue <br /> ~anho1es 1 36"RCP 1.750LF 536/LF 63.000.00 <br /> 350LF $92llF 32.200.00 JI Oewatel'ing S12lLF 21,000.00 <br /> 2 60~ flCP S15/LF 5,250.00 Asphalt Replacement S13/lF 22,750.00 <br /> Gewaterlng 513/LF 4,550.00 ,'lanholes S4/LF 7,000.00 <br /> Asphalt Replacement S4/LF 1,400.00 . <br /> I".anholes Total Construction Cost 51,003,000.00 <br /> 2,7SOLF S101/lF 271.750.00 <br /> l 56"RCP S~S/Lr ~: ,250.00 Engineering and Contingencies 200,500.00 <br /> 0,"",aterin9 S13/LF 35,750.00 <br /> Asphalt Replacement S 4!\.~ l1/JQO.CO le'.lal, Fisc.!l. and Administration 50,180.00 <br /> :.tanholes <br /> 1 L.S. 30,QOO.CO TOT~L COST Sl.263,7iI().0~ <br /> , O~tl~t Structur~ <br /> <br /> <br /> <br />111 <br /> <br /> <br />113 <br />