My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00869
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:29:13 PM
Creation date
10/4/2006 9:33:04 PM
Metadata
Fields
Template:
Floodplain Documents
County
Prowers
Community
Wiley
Stream Name
Wiley Drainage Ditch
Title
Hazard Mitigation Grant Program Project Application Wiley Drainage Ditch Prowers County, Colorado
Date
7/1/1999
Prepared For
CWCB / FEMA
Prepared By
Prowers County, CWCB
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />DESCRIPTION OF THE PROPOSED PROJECT <br />(Selected Alternative Only) <br /> <br />Project Location <br />The project is located in the Town of Wiley, Prowers County, Colorado. The basic project <br />consists of replacing an existing highway bridge with a much larger bridge that has IOO-year <br />flood capacity. In addition, some channel improvements upstream and downstream of the <br />highway bridge would be required to maximize channel capacity, and minimize the flood threat <br />to adjacent homes and properties. <br /> <br />Project Photos and Videos <br />Photographs of the project area are included as attachments. <br /> <br />DSRs from Previous Disaster Declarations <br />Not Applicable. <br /> <br />Project Description <br />. Proposed Scope of Work (including materials and labor) <br />Replacement of existing highway bridge with a larger bridge to include structural <br />demolition, new construction using steel and concrete, channel earthwork and <br />grading, and revegetation. <br /> <br />. Is project an independent solution of problem or would it be part of a larger <br />project? The project is an independent solution to the problem. <br /> <br />. Future maintenance requirements <br />Routine channel and bridge maintenance would be required, and would be completed <br />by the Colorado Department of Transportation, the Town of Wiley, and Prowers <br />County, <br />
The URL can be used to link to this page
Your browser does not support the video tag.